Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10132
Well Classification: GW Status: PR - 12/28/2004
Well Name/No:FEDERAL #GM 434-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C-24603
Facility Status:PRStatus Date12/28/2004
FacilityID:272685LocationID:334846
County:GARFIELD #045Location:SWSE 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5741 ft.
Basin:PICEANCE BASIN  
Planned Location:224FSL  1709 FELLat/Long: 39.459379 / -108.093016Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.459426 / -108.093119Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/28/2004             Measured TD: 6610 ft.    Vertical TD: 6568 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/28/2004
Wellbore PermitDIRECTIONAL
Permit #:20041267 Expiration Date:6/21/2005
Proposed Top PZ Location:Sec: Twp: Footage: 624 FSL  2103 FEL
Bottom Hole Location:Sec: Twp: Footage: 624 FSL  2103 FEL
Proposed Depth/Form:6623 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:11/16/2004
Spud Date:9/19/2004Spud Date Is:ACTUAL
Measured TD:6610 ft.Measured PB depth:6545 ft.
True Vertical TD:6568 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 624 FSL  2103 FEL
Bottom Hole Location:Sec: Twp: Footage: 624 FSL  2103 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1109 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1109 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6593 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 685, Top: 3100 ft., Bottom: 6592 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH1820 ft.NN
FORT UNION2135 ft.NN
MENEFEE-POINT LOOKOUT3522 ft.NN
CAMEO5980 ft.NN
ROLLINS6457 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/28/2004                Interval Top: 4686 ft.    Interval Bottom: 6443 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/16/2004
Treatment Summary:4000 GALS 7 1/2% HCL, 603679# 30/50, 14294 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6111 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/28/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1404
CASING_PRESS 1410
MCF_GAS 1404
TUBING_PRESS 1285
Perforation Data:
Interval Top:4686 ft.# Of Holes:92
Interval Bottom:6443 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)9
Total Gas Produced (MCF)5204
GOR578222
GOR DeterminationMCFE
Average BOE per Day2.491
Average MCFE per Day14.454

 Federal Financial Assurance  i Y

 Tribal Well  i No