Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10127
Well Classification: GW Status: PR - 3/30/2005
Well Name/No:CLOUGH #RWF 512-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CR160
Facility Status:PRStatus Date3/30/2005
FacilityID:272673LocationID:335221
County:GARFIELD #045Location:SWNW 21 6S94W 6
Field:RULISON - #75400Elevation:5392 ft.
Basin:PICEANCE BASIN  
Planned Location:1859FNL  820 FWLLat/Long: 39.512899 / -107.899900Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.513020 / -107.899941Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/30/2005             Measured TD: 7870 ft.    Vertical TD: 7862 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/30/2005
Wellbore PermitDIRECTIONAL
Permit #:20041234 Expiration Date:6/21/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1772 FNL  581 FWL
Bottom Hole Location:Sec: Twp: Footage: 1772 FNL  581 FWL
Proposed Depth/Form:7953 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:4/2/2005
Spud Date:2/9/2005Spud Date Is:ACTUAL
Measured TD:7870 ft.Measured PB depth:7800 ft.
True Vertical TD:7862 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1772 FNL  581 FWL
Bottom Hole Location:Sec: Twp: Footage: 1772 FNL  581 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1116 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 1116 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7846 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 995, Top: 5300 ft., Bottom: 7846 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1713 ft.NN
MESAVERDE4193 ft.NN
CAMEO6931 ft.NN
ROLLINS7890 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/30/2005                 Interval Top: 5456 ft.    Interval Bottom: 7706 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/2/2005
Treatment Summary:4250 GAL 7 1/2% HCL, 545200# 20/40, 13265 BBL SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6885 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/7/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1614
CASING_PRESS 1611
MCF_GAS 1614
TUBING_PRESS 1492
Perforation Data:
Interval Top:5456 ft.# Of Holes:93
Interval Bottom:7706 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)15573
GOR819631
GOR DeterminationMCFE
Average BOE per Day7.416
Average MCFE per Day43.006

 Federal Financial Assurance  i 

 Tribal Well  i No