Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10116
Well Classification: GW Status: PR - 12/31/2004
Well Name/No:FEDERAL #GM 414-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 24603
Facility Status:PRStatus Date12/31/2004
FacilityID:272650LocationID:334817
County:GARFIELD #045Location:SESW 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5894 ft.
Basin:PICEANCE BASIN  
Planned Location:824FSL  1692 FWLLat/Long: 39.460959 / -108.099426Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.461022 / -108.099400Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/31/2004             Measured TD: 6800 ft.    Vertical TD: 6663 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/31/2004
Wellbore PermitDIRECTIONAL
Permit #:20041180 Expiration Date:6/16/2005
Proposed Top PZ Location:Sec: Twp: Footage: 534 FSL  823 FWL
Bottom Hole Location:Sec: Twp: Footage: 534 FSL  823 FWL
Proposed Depth/Form:6764 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:11/21/2004
Spud Date:9/2/2004Spud Date Is:ACTUAL
Measured TD:6800 ft.Measured PB depth:6790 ft.
True Vertical TD:6663 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 534 FSL  823 FWL
Bottom Hole Location:Sec: Twp: Footage: 534 FSL  823 FWL
Log Types:HIGH RESOLUTION INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1121 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1121 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6785 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 3170 ft., Bottom: 6785 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2032 ft.NN
FORT UNION2359 ft.NN
MESAVERDE3703 ft.NN
CAMEO6176 ft.NN
ROLLINS6625 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/31/2004                Interval Top: 4869 ft.    Interval Bottom: 6589 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/21/2004
Treatment Summary:4000 GAL 7 1/2% HCL, 460399# 30/50, 12367 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6232 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/31/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1105
CASING_PRESS 1449
MCF_GAS 1105
TUBING_PRESS 1440
Perforation Data:
Interval Top:4869 ft.# Of Holes:91
Interval Bottom:6589 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)10
Total Gas Produced (MCF)6238
GOR623800
GOR DeterminationMCFE
Average BOE per Day2.976
Average MCFE per Day17.257

 Federal Financial Assurance  i Y

 Tribal Well  i No