Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10113
Well Classification: GW Status: PR - 12/22/2004
Well Name/No:FEDERAL #GM 14-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 24603
Facility Status:PRStatus Date12/22/2004
FacilityID:272645LocationID:334817
County:GARFIELD #045Location:SESW 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5888 ft.
Basin:PICEANCE BASIN  
Planned Location:853FSL  1696 FWLLat/Long: 39.461039 / -108.099396Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.461101 / -108.099376Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/22/2004             Measured TD: 6823 ft.    Vertical TD: 6632 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/22/2004
Wellbore PermitDIRECTIONAL
Permit #:20041182 Expiration Date:6/16/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1190 FSL  489 FWL
Bottom Hole Location:Sec: Twp: Footage: 1190 FSL  489 FWL
Proposed Depth/Form:6873 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:11/21/2004
Spud Date:9/26/2004Spud Date Is:ACTUAL
Measured TD:6823 ft.Measured PB depth:6750 ft.
True Vertical TD:6632 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1190 FSL  489 FWL
Bottom Hole Location:Sec: Twp: Footage: 1190 FSL  489 FWL
Log Types:HIGH RESOLUTION INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1127 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1127 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6802 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 3890 ft., Bottom: 6802 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2045 ft.NN
FORT UNION2371 ft.NN
MESAVERDE3785 ft.NN
CAMEO6244 ft.NN
ROLLINS6718 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/22/2004                Interval Top: 4944 ft.    Interval Bottom: 6537 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/21/2004
Treatment Summary:4000 GALS 7 1/2% HCL, 470368# 30/50, 12572 BBLS SLICK WATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:6330 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/22/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1292
CASING_PRESS 1755
MCF_GAS 1292
TUBING_PRESS 1678
Perforation Data:
Interval Top:4944 ft.# Of Holes:87
Interval Bottom:6537 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)17929
GOR896450
GOR DeterminationMCFE
Average BOE per Day8.529
Average MCFE per Day49.491

 Federal Financial Assurance  i Y

 Tribal Well  i No