Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10063
Well Classification: GW Status: PR - 1/27/2006
Well Name/No:PA #534-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/27/2006
FacilityID:272375LocationID:334700
County:GARFIELD #045Location:SWSE 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5140 ft.
Basin:PICEANCE BASIN  
Planned Location:811FSL  2046 FELLat/Long: 39.476049 / -108.019614Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.476078 / -108.019591Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/27/2006             Measured TD: 6617 ft.    Vertical TD: 6530 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/27/2006
Wellbore PermitDIRECTIONAL
Permit #:20051106 Expiration Date:4/25/2006
Proposed Top PZ Location:Sec: Twp: Footage: 540 FSL  2040 FEL
Bottom Hole Location:Sec: Twp: Footage: 540 FSL  2040 FEL
Proposed Depth/Form:6580 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:11/21/2005
Spud Date:11/12/2005Spud Date Is:ACTUAL
Measured TD:6617 ft.Measured PB depth:6582 ft.
True Vertical TD:6530 ft.True Vertical PB depth:
Top PZ Location:Sec:32 Twp: 6S 95WFootage: 186 FSL  1558 FEL
Bottom Hole Location:Sec:32 Twp: 6S 95WFootage: 186 FSL  1558 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 1500 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6616 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 885, Top: 2130 ft., Bottom: 6616 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1260 ft.NN
FORT UNION1530 ft.NN
MESAVERDE3351 ft.NN
CAMEO5828 ft.NN
ROLLINS6491 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/27/2006                 Interval Top: 4501 ft.    Interval Bottom: 6433 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/23/2005Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/20/2005
Treatment Summary:12/20/05 534 GALS 7 1/2% HCL; 4000 GALS 10% ACETIC ACID; 859100# 30/50 SAND; 16106 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6079 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/27/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1317
CASING_PRESS 1551
TUBING_PRESS 1439
Perforation Data:
Interval Top:4501 ft.# Of Holes:123
Interval Bottom:6433 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)19997
GOR740629
GOR DeterminationMCFE
Average BOE per Day9.520
Average MCFE per Day55.230

 Federal Financial Assurance  i 

 Tribal Well  i No