Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10060
Well Classification: GW Status: PR - 11/10/2004
Well Name/No:FEDERAL #PA 42-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62162
Facility Status:PRStatus Date11/10/2004
FacilityID:272378LocationID:335450
County:GARFIELD #045Location:SENE 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5867 ft.
Basin:PICEANCE BASIN  
Planned Location:2105FNL  769 FELLat/Long: 39.496709 / -108.015124Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.496719 / -108.015074Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/10/2004             Measured TD: 7868 ft.    Vertical TD: 7862 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/10/2004
Wellbore PermitDIRECTIONAL
Permit #:20040995 Expiration Date:5/23/2005
Proposed Top PZ Location:Sec: Twp: Footage: 2351 FNL  552 FEL
Bottom Hole Location:Sec: Twp: Footage: 2049 FNL  595 FEL
Proposed Depth/Form:7975 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/6/2004
Spud Date:9/4/2004Spud Date Is:ACTUAL
Measured TD:7868 ft.Measured PB depth:7831 ft.
True Vertical TD:7862 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2351 FNL  552 FEL
Bottom Hole Location:Sec: Twp: Footage: 2049 FNL  595 FEL
Log Types:HIGH DEFINITION IND COMP Z-DENSILOG COMP NEU,GR.CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2477 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 2476 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7848 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 4105 ft., Bottom: 7848 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH2296 ft.NN
FORT UNION2650 ft.NN
MESAVERDE4465 ft.NN
CAMEO7214 ft.NN
ROLLINS7823 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/10/2004                Interval Top: 5802 ft.    Interval Bottom: 7808 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/6/2004
Treatment Summary:4000 GALS 7 1/2% HCL, 596895 20/40, 14554 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7315 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/10/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1264
CASING_PRESS 1349
MCF_GAS 1264
TUBING_PRESS 1195
Perforation Data:
Interval Top:5802 ft.# Of Holes:97
Interval Bottom:7808 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9582
GOR798500
GOR DeterminationMCFE
Average BOE per Day4.560
Average MCFE per Day26.458

 Federal Financial Assurance  i Y

 Tribal Well  i No