Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10029
Well Classification: GW Status: PR - 1/1/2023
Well Name/No:FEDERAL #RMV 39-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2023
FacilityID:272130LocationID:335788
County:GARFIELD #045Location:SWNW 16 6S94W 6
Field:RULISON - #75400Elevation:5682 ft.
Basin:PICEANCE BASIN  
Planned Location:1525FNL  623 FWLLat/Long: 39.528169 / -107.900690Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.528272 / -107.900745Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2023             Measured TD: 8430 ft.    Vertical TD: 8404 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2023
Wellbore PermitDIRECTIONAL
Permit #:20040854 Expiration Date:4/29/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1483 FNL  1136 FWL
Bottom Hole Location:Sec: Twp: Footage: 1483 FNL  1136 FWL
Proposed Depth/Form:8400 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:9/27/2004
Spud Date:8/26/2004Spud Date Is:ACTUAL
Measured TD:8430 ft.Measured PB depth:8360 ft.
True Vertical TD:8404 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1483 FNL  1136 FWL
Bottom Hole Location:Sec: Twp: Footage: 1483 FNL  1136 FWL
Log Types:HIGH RESOLUTION INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1117 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1117 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8414 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1125, Top: 4600 ft., Bottom: 8414 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2145 ft.NN
MESAVERDE4658 ft.NN
CAMEO7452 ft.NN
ROLLINS8371 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2023                  Interval Top: 6340 ft.    Interval Bottom: 8324 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/27/2004
Treatment Summary:4250 GALS 7-1/2% HCL, 517,368# 30/50, 12,592 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:7742 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/11/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1075
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1454
CASING_PRESS 1656
MCF_GAS 1454
TUBING_PRESS 1465
Perforation Data:
Interval Top:6340 ft.# Of Holes:93
Interval Bottom:8324 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)10920
GOR404444
GOR DeterminationMCFE
Average BOE per Day5.233
Average MCFE per Day30.352

 Federal Financial Assurance  i Y

 Tribal Well  i No