Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10016
Well Classification: GW Status: PR - 8/30/2004
Well Name/No:FEDERAL #GM 32-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/30/2004
FacilityID:272084LocationID:334969
County:GARFIELD #045Location:SWNE 11 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5607 ft.
Basin:PICEANCE BASIN  
Planned Location:1934FNL  2039 FELLat/Long: 39.453989 / -108.075205Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.454322 / -108.075421Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/30/2004             Measured TD: 6614 ft.    Vertical TD: 6594 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/30/2004
Wellbore PermitDIRECTIONAL
Permit #:20040819 Expiration Date:4/28/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1629 FNL  1807 FEL
Bottom Hole Location:Sec: Twp: Footage: 1629 FNL  1807 FEL
Proposed Depth/Form:6540 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:7/25/2004
Spud Date:6/26/2004Spud Date Is:ACTUAL
Measured TD:6614 ft.Measured PB depth:6528 ft.
True Vertical TD:6594 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1629 FNL  1807 FEL
Bottom Hole Location:Sec: Twp: Footage: 1629 FNL  1807 FEL
Log Types:C B L
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1121 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1121 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6614 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 3360 ft., Bottom: 6613 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1725 ft.NN
FORT UNION2007 ft.NN
MESAVERDE3426 ft.NN
CAMEO5888 ft.NN
ROLLINS6410 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/30/2004                 Interval Top: 4720 ft.    Interval Bottom: 6291 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/25/2004
Treatment Summary:1000 GALS 7 1/2% HCL, 129272# 30/50 SAND, 3033 BBLS SLICKWATER // 750 GALS 7 1/2% HCL, 136852# 30/50 SAND, 3227 BBLS SLICK WATER // 750 GALS 7 1/2% HCL, 119651# 30/50 SAND, 2755 BBLS SLICK WATER // 750 GALS 7 1/2% HCL, 131896# 30/50 SAND, 3312 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5968 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/30/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1320
CASING_PRESS 1621
MCF_GAS 1320
TUBING_PRESS 1504
Perforation Data:
Interval Top:4720 ft.# Of Holes:78
Interval Bottom:6291 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)10908
GOR779142
GOR DeterminationMCFE
Average BOE per Day5.189
Average MCFE per Day30.114

 Federal Financial Assurance  i Y

 Tribal Well  i No