Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09974
Well Classification: GW Status: PR - 1/1/2018
Well Name/No:FEDERAL #GM 444-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C 24603
Facility Status:PRStatus Date1/1/2018
FacilityID:271854LocationID:334876
County:GARFIELD #045Location:SESE 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5551 ft.
Basin:PICEANCE BASIN  
Planned Location:625FSL  672 FELLat/Long: 39.460509 / -108.089206Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.460555 / -108.089083Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2018             Measured TD: 6432 ft.    Vertical TD: 6426 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2018
Wellbore PermitDIRECTIONAL
Permit #:20040633 Expiration Date:4/7/2005
Proposed Top PZ Location:Sec: Twp: Footage: 794 FSL  807 FEL
Bottom Hole Location:Sec: Twp: Footage: 794 FSL  807 FEL
Proposed Depth/Form:6470 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:9/18/2004
Spud Date:8/16/2004Spud Date Is:ACTUAL
Measured TD:6432 ft.Measured PB depth:6255 ft.
True Vertical TD:6426 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 794 FSL  807 FEL
Bottom Hole Location:Sec: Twp: Footage: 794 FSL  807 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, C B L
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1125 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1124 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6419 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 730, Top: 2375 ft., Bottom: 7419 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1659 ft.NN
FORT UNION1965 ft.NN
MESAVERDE3335 ft.NN
CAMEO5818 ft.NN
ROLLINS6311 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2018                  Interval Top: 4551 ft.    Interval Bottom: 6127 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/18/2004
Treatment Summary:4000 GALS 7 1/2% HCL, 642952# 30/50, 13828 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5923 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/6/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1094
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1132
CASING_PRESS 1066
MCF_GAS 1132
TUBING_PRESS 932
Perforation Data:
Interval Top:4551 ft.# Of Holes:91
Interval Bottom:6127 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)6642
GOR603818
GOR DeterminationMCFE
Average BOE per Day3.168
Average MCFE per Day18.384

 Federal Financial Assurance  i Y

 Tribal Well  i No