Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09973
Well Classification: GW Status: PR - 10/30/2004
Well Name/No:FEDERAL #GM 344-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C 24603
Facility Status:PRStatus Date10/30/2004
FacilityID:271853LocationID:334876
County:GARFIELD #045Location:SESE 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5551 ft.
Basin:PICEANCE BASIN  
Planned Location:635FSL  685 FELLat/Long: 39.460539 / -108.089246Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.460582 / -108.089123Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/30/2004             Measured TD: 6475 ft.    Vertical TD: 6438 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/30/2004
Wellbore PermitDIRECTIONAL
Permit #:20040634 Expiration Date:4/7/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1018 FSL  1128 FEL
Bottom Hole Location:Sec: Twp: Footage: 1018 FSL  1128 FEL
Proposed Depth/Form:6470 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:9/20/2004
Spud Date:8/26/2004Spud Date Is:ACTUAL
Measured TD:6475 ft.Measured PB depth:6256 ft.
True Vertical TD:6438 ft.True Vertical PB depth:5567 ft.
Top PZ Location:Sec: Twp: Footage: 1018 FSL  1128 FEL
Bottom Hole Location:Sec: Twp: Footage: 1018 FSL  1128 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, C B L
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1120 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: , Bottom: 1120 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6475 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 730, Top: 3030 ft., Bottom: 6475 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1671 ft.NN
FORT UNION1978 ft.NN
MESAVERDE3353 ft.NN
CAMEO5845 ft.NN
ROLLINS6334 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/30/2004                Interval Top: 4594 ft.    Interval Bottom: 6145 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/20/2004
Treatment Summary:4000 GALS 7 1/2% HCL, 597484# 30/50, 15044 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5857 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1128
CASING_PRESS 1176
MCF_GAS 1128
TUBING_PRESS 1119
Perforation Data:
Interval Top:4594 ft.# Of Holes:91
Interval Bottom:6145 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)5845
GOR531363
GOR DeterminationMCFE
Average BOE per Day2.787
Average MCFE per Day16.195

 Federal Financial Assurance  i Y

 Tribal Well  i No