Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09960
Well Classification: GW Status: PR - 8/22/2004
Well Name/No:FEDERAL #RWF 11-18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62160
Facility Status:PRStatus Date8/22/2004
FacilityID:271812LocationID:335569
County:GARFIELD #045Location:NENW 18 6S94W 6
Field:RULISON - #75400Elevation:6164 ft.
Basin:PICEANCE BASIN  
Planned Location:1161FNL  987 FWLLat/Long: 39.528839 / -107.934772Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.528931 / -107.934746Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/22/2004             Measured TD: 8823 ft.    Vertical TD: 8745 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/22/2004
Wellbore Permit
Permit #:20040604 Expiration Date:4/5/2005
Proposed Depth/Form:8950 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:7/15/2004
Spud Date:5/30/2004Spud Date Is:ACTUAL
Measured TD:8823 ft.Measured PB depth:8765 ft.
True Vertical TD:8745 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 795 FNL  219 FWL
Bottom Hole Location:Sec: Twp: Footage: 809 FNL  232 FWL
Log Types:THERMAL MULTIGATE DECAY LOG, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1409 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 541, Top: 0 ft., Bottom: 1409 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8800 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1020, Top: 4680 ft., Bottom: 8800 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2978 ft.NN
MESAVERDE5370 ft.NN
CAMEO8018 ft.NN
ROLLINS8968 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/22/2004                 Interval Top: 6786 ft.    Interval Bottom: 8671 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/2004
Treatment Summary:750 GALS 7 1/2% HCL, 107879# 30/50, 2542 BBLS SLICK WATER // 1000 GALS 7 1/2% HCL, 112291# 30/50, 2721 BBLS SLICK WATER. // 750 GALS 7 1/2% HCL, 87142# 30/50, 2188 BBLS SLICK WATER // 750 GALS 7 1/2% HCL, 148193# 30/50, 3432 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:8443 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/22/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1082
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1465
CASING_PRESS 1658
MCF_GAS 1465
TUBING_PRESS 1494
Perforation Data:
Interval Top:6786 ft.# Of Holes:104
Interval Bottom:8671 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)82
Total Gas Produced (MCF)15951
GOR194524
GOR DeterminationMCFE
Average BOE per Day7.760
Average MCFE per Day45.007

 Federal Financial Assurance  i Y

 Tribal Well  i No