Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09956
Well Classification: GW Status: PR - 9/1/2020
Well Name/No:FEDERAL #RWF 21-18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62160
Facility Status:PRStatus Date9/1/2020
FacilityID:271783LocationID:335569
County:GARFIELD #045Location:NENW 18 6S94W 6
Field:RULISON - #75400Elevation:6160 ft.
Basin:PICEANCE BASIN  
Planned Location:1149FNL  996 FWLLat/Long: 39.528869 / -107.934742Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.528964 / -107.934716Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2020             Measured TD: 8920 ft.    Vertical TD: 8900 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2020
Wellbore PermitDIRECTIONAL
Permit #:20040585 Expiration Date:4/1/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1235 FNL  1460 FWL
Bottom Hole Location:Sec: Twp: Footage: 1235 FNL  1460 FWL
Proposed Depth/Form:8925 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:7/15/2004
Spud Date:6/19/2004Spud Date Is:ACTUAL
Measured TD:8920 ft.Measured PB depth:8872 ft.
True Vertical TD:8900 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1235 FNL  1460 FWL
Bottom Hole Location:Sec: Twp: Footage: 1235 FNL  1460 FWL
Log Types:HIGH RESOLUTION IND SPECTRAL DEN DUAL SPACED NEU.,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1396 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 1395 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8902 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1060, Top: 4200 ft., Bottom: 8902 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2917 ft.NN
MESAVERDE5298 ft.NN
CAMEO7927 ft.NN
ROLLINS8863 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2020                  Interval Top: 6703 ft.    Interval Bottom: 8844 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/2004
Treatment Summary:750 GALS 7 1/2% HCL, 141480# 30/50, 3243 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:8676 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/22/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1011
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1813
CASING_PRESS 2349
MCF_GAS 1813
TUBING_PRESS 2162
Perforation Data:
Interval Top:6703 ft.# Of Holes:101
Interval Bottom:8844 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)41
Total Gas Produced (MCF)8099
GOR197536
GOR DeterminationMCFE
Average BOE per Day3.940
Average MCFE per Day22.838

 Federal Financial Assurance  i Y

 Tribal Well  i No