Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09955
Well Classification: GW Status: PR - 10/15/2004
Well Name/No:FEDERAL #GM 542-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/15/2004
FacilityID:271784LocationID:334956
County:GARFIELD #045Location:SENE 11 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5473 ft.
Basin:PICEANCE BASIN  
Planned Location:2154FNL  1104 FELLat/Long: 39.453519 / -108.071895Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.453707 / -108.072144Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/15/2004             Measured TD: 6461 ft.    Vertical TD: 6441 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/15/2004
Wellbore PermitDIRECTIONAL
Permit #:20040583 Expiration Date:4/1/2005
Proposed Top PZ Location:Sec: Twp: Footage: 2502 FNL  664 FEL
Bottom Hole Location:Sec: Twp: Footage: 2502 FNL  664 FEL
Proposed Depth/Form:6458 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:9/5/2004
Spud Date:8/9/2004Spud Date Is:ACTUAL
Measured TD:6461 ft.Measured PB depth:6381 ft.
True Vertical TD:6441 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2502 FNL  664 FEL
Bottom Hole Location:Sec: Twp: Footage: 2502 FNL  664 FEL
Log Types:HDICZDCNGR, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1127 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1127 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6420 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 2600 ft., Bottom: 6420 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION1611 ft.NN
MESAVERDE1915 ft.NN
CAMEO5850 ft.NN
ROLLINS6288 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/15/2004                Interval Top: 4647 ft.    Interval Bottom: 6245 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2004
Treatment Summary:FRAC'D WITH 3250 GALS 7-1/2% HCL, 578251# 30/50, 13474 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:5773 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/15/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1302
CASING_PRESS 1331
MCF_GAS 1302
TUBING_PRESS 1233
Perforation Data:
Interval Top:4647 ft.# Of Holes:84
Interval Bottom:6245 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9305
GOR775416
GOR DeterminationMCFE
Average BOE per Day4.430
Average MCFE per Day25.690

 Federal Financial Assurance  i Y

 Tribal Well  i No