Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09937
Well Classification: GW Status: PR - 10/4/2004
Well Name/No:FEDERAL PA #32-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62162
Facility Status:PRStatus Date10/4/2004
FacilityID:271715LocationID:335255
County:GARFIELD #045Location:SENE 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5890 ft.
Basin:PICEANCE BASIN  
Planned Location:1643FNL  1117 FELLat/Long: 39.497976 / -108.016282Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.497991 / -108.016271Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/4/2004             Measured TD: 8050 ft.    Vertical TD: 7955 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/4/2004
Wellbore PermitDIRECTIONAL
Permit #:20040508 Expiration Date:3/25/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1558 FNL  1996 FEL
Bottom Hole Location:Sec: Twp: Footage: 1558 FNL  1998 FEL
Proposed Depth/Form:7980 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/17/2004
Spud Date:6/9/2004Spud Date Is:ACTUAL
Measured TD:8050 ft.Measured PB depth:7994 ft.
True Vertical TD:7955 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1558 FNL  1996 FEL
Bottom Hole Location:Sec: Twp: Footage: 1558 FNL  1998 FEL
Log Types:RESERVOIR PERFORMANCE MONITOR, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2508 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 2507 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8025 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 931, Top: 4050 ft., Bottom: 8024 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G2300 ft.NN
FORT UNION2652 ft.NN
MESAVERDE4449 ft.NN
CAMEO7281 ft.NN
ROLLINS7875 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/4/2004                 Interval Top: 5864 ft.    Interval Bottom: 7864 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/17/2004
Treatment Summary:3250 GASL 7 1/2% HCL, 514868# 30/50, 12182 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7417 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/4/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1378
CASING_PRESS 1894
MCF_GAS 1378
TUBING_PRESS 1810
Perforation Data:
Interval Top:5864 ft.# Of Holes:77
Interval Bottom:7864 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)10229
GOR538368
GOR DeterminationMCFE
Average BOE per Day4.879
Average MCFE per Day28.337

 Federal Financial Assurance  i Y

 Tribal Well  i No