Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09927
Well Classification: GW Status: PR - 6/1/2022
Well Name/No:FEDERAL #PA 42-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date6/1/2022
FacilityID:271671LocationID:335286
County:GARFIELD #045Location:NENE 20 6S95W 6
Field:PARACHUTE - #67350Elevation:6428 ft.
Basin:PICEANCE BASIN  
Planned Location:1287FNL  833 FELLat/Long: 39.514078 / -108.016104Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.514072 / -108.016019Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2022             Measured TD: 8900 ft.    Vertical TD: 8820 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2022
Wellbore PermitDIRECTIONAL
Permit #:20040488 Expiration Date:3/23/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1851 FNL  151 FEL
Bottom Hole Location:Sec: Twp: Footage: 1851 FNL  150 FEL
Proposed Depth/Form:8960 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:11/5/2004
Spud Date:9/2/2004Spud Date Is:ACTUAL
Measured TD:8900 ft.Measured PB depth:8820 ft.
True Vertical TD:8820 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1851 FNL  151 FEL
Bottom Hole Location:Sec: Twp: Footage: 1851 FNL  150 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1078 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 0 ft., Bottom: 1078 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8886 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 867, Top: 4514 ft., Bottom: 8886 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3203 ft.NN
FORT UNION3571 ft.NN
MESAVERDE5456 ft.NN
CAMEO COAL8151 ft.NN
ROLLINS8884 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/1/2022                  Interval Top: 6957 ft.    Interval Bottom: 8811 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/5/2004Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2004
Treatment Summary:4000 GALS 7 1/2% HCL, 490494# 30/50, 13999 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8352 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/20/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 889
CASING_PRESS 1165
MCF_GAS 889
TUBING_PRESS 942
Perforation Data:
Interval Top:6957 ft.# Of Holes:88
Interval Bottom:8811 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)6716
GOR395058
GOR DeterminationMCFE
Average BOE per Day3.217
Average MCFE per Day18.681

 Federal Financial Assurance  i Y

 Tribal Well  i No