Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09874
Well Classification: OW Status: PR - 7/9/2004
Well Name/No:AMERICAN SODA #GM 432-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 46603
Facility Status:PRStatus Date7/9/2004
FacilityID:271407LocationID:334802
County:GARFIELD #045Location:SWNE 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5628 ft.
Basin:PICEANCE BASIN  
Planned Location:2301FNL  1974 FELLat/Long: 39.466939 / -108.092996Lat/Long Source: Calculated From Footages
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/9/2004             Measured TD: 6630 ft.    Vertical TD: 6518 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/9/2004
Wellbore PermitDIRECTIONAL
Permit #:20040288 Expiration Date:2/26/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1336 FNL  2045 FEL
Bottom Hole Location:Sec: Twp: Footage: 1336 FNL  2051 FEL
Proposed Depth/Form:6680 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:5/27/2004
Spud Date:4/17/2004Spud Date Is:ACTUAL
Measured TD:6630 ft.Measured PB depth:6598 ft.
True Vertical TD:6518 ft.True Vertical PB depth:6486 ft.
Top PZ Location:Sec:3 Twp: 7S 96WFootage: 2053 FNL  1754 FEL
Bottom Hole Location:Sec:3 Twp: 7S 96WFootage: 2053 FNL  1754 FEL
Log Types:CHI PROCESSED TRIPLE COMBO, RESERVOI MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1124 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: 0 ft., Bottom: 1124 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6614 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 3100 ft., Bottom: 6614 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION2124 ft.NN
MESAVERDE3546 ft.NN
CAMEO5972 ft.NN
ROLLINS6506 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 7/9/2004                  Interval Top: 4792 ft.    Interval Bottom: 6378 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/9/2004
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:2.375 in.Tubing Setting Depth:6029 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/9/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 143000
CALC_MCF_GAS 1430
CASING_PRESS 1231
MCF_GAS 11430
TUBING_PRESS 1129
Perforation Data:
Interval Top:4792 ft.# Of Holes:92
Interval Bottom:6378 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)17098
GOR777181
GOR DeterminationMCFE
Average BOE per Day8.134
Average MCFE per Day47.203

 Federal Financial Assurance  i 

 Tribal Well  i No