Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09860
Well Classification: GW Status: PR - 6/27/2004
Well Name/No:PA #434-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 66632
Facility Status:PRStatus Date6/27/2004
FacilityID:271283LocationID:335343
County:GARFIELD #045Location:SWSE 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5413 ft.
Basin:PICEANCE BASIN  
Planned Location:732FSL  1589 FELLat/Long: 39.490259 / -107.999463Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.490330 / -107.999447Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/27/2004             Measured TD: 7465 ft.    Vertical TD: 7408 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/27/2004
Wellbore PermitDIRECTIONAL
Permit #:20040230 Expiration Date:2/18/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1163 FSL  2102 FEL
Bottom Hole Location:Sec: Twp: Footage: 1168 FSL  2112 FEL
Proposed Depth/Form:7480 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:5/22/2004
Spud Date:4/4/2004Spud Date Is:ACTUAL
Measured TD:7465 ft.Measured PB depth:7433 ft.
True Vertical TD:7408 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1163 FSL  2102 FEL
Bottom Hole Location:Sec: Twp: Footage: 1168 FSL  2112 FEL
Log Types:HI RES INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2022 ft., Weight: 32.2 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 2022 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7465 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 905, Top: 2750 ft., Bottom: 7465 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1786 ft.NN
FORT UNION2141 ft.NN
MESAVERDE4020 ft.NN
CAMEO6668 ft.NN
ROLLINS7369 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/27/2004                 Interval Top: 5080 ft.    Interval Bottom: 7309 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/22/2004
Treatment Summary:6680-7309';1000 GAL 7 1/2% HCL,133514#30/50,3048 BBL SLICK WATER;6508-6791;;750 GAL 7 1.2% HCL,140635# 30/50,3229 BBL SLICK WTR;5958-6364';750 GAL 7 1/2% HCL,127001#30/50,2963 BLS SLK WTR.;5476-5771'750GAL 7 1/2% HCL,129668#30/50,2985 BBL ;5080-5367';CONT
Tubing Size:2.375 in.Tubing Setting Depth:6863 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/27/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_GOR 136300
CALC_MCF_GAS 1363
CASING_PRESS 1695
TUBING_PRESS 1578
Perforation Data:
Interval Top:5080 ft.# Of Holes:96
Interval Bottom:7309 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)11072
GOR790857
GOR DeterminationMCFE
Average BOE per Day5.270
Average MCFE per Day30.571

 Federal Financial Assurance  i 

 Tribal Well  i No