|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/9/2005 Measured TD: 7426 ft. Vertical TD: 7406 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/9/2005 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20040232 | Expiration Date: | 2/18/2005 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 613 FSL 611 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 613 FSL 611 FEL | | Proposed Depth/Form: | 7465 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E/2 |
| | |
| Wellbore Completed | | Completion Date: | 4/3/2005 | | Spud Date: | 12/29/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7426 ft. | Measured PB depth: | 7180 ft. | | True Vertical TD: | 7406 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 613 FSL 611 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 613 FSL 611 FEL | | Log Types: | RESERVOIR MONITOR TOOL ELITE; CBL | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1949 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 1949 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 1.5 in., Top: 0 ft., Depth: 7413 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 868, Top: 3135 ft., Bottom: 7413 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1739 ft. | | N | N | | FORT UNION | 2026 ft. | | N | N | | MESAVERDE | 3971 ft. | | N | N | | CAMEO | 6635 ft. | | N | N | | ROLLINS | 7353 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 5/9/2005 Interval Top: 5024 ft. Interval Bottom: 7030 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/3/2005 | | Treatment Summary: | 4750 GALS 7 1/2% HCL, 847300# 30/50, 15605 BBLS SLICK WATER (SUMMARY) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6747 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/9/2005 | Test Method: | | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 1039 | | CASING_PRESS | 1000 | | TUBING_PRESS | 1096 |
| | Perforation Data: | | Interval Top: | 5024 ft. | # Of Holes: | 107 | | Interval Bottom: | 7030 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 20 |
| Total Gas Produced (MCF) | 9211 |
| GOR | 460550 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.403 |
| Average MCFE per Day | 25.565 |
| Federal Financial Assurance | i | |
|
|