Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09827
Well Classification: GW Status: PR - 8/1/2020
Well Name/No:S.PARACHUTE FEDERAL #31-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C 27823
Facility Status:PRStatus Date8/1/2020
FacilityID:271023LocationID:334085
County:GARFIELD #045Location:SENW 31 7S95W 6
Field:PARACHUTE - #67350Elevation:5835 ft.
Basin:PICEANCE BASIN  
Planned Location:2321FNL  1420 FWLLat/Long: 39.394940 / -108.043604Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.394960 / -108.043610Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2020             Measured TD: 6090 ft.    Vertical TD: 6090 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2020
Wellbore Permit
Permit #:20040034 Expiration Date:1/28/2005
Proposed Depth/Form:7200 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 139.31 , Unit Acreage: 640, Drill Unit: SEC 31
Casing:String Type: CONDUCTOR, Hole Size: 16 in., Size: 13.375 in., Top: , Depth: 90 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 10, Top: 0 ft., Bottom: 90 ft.

Wellbore Completed
Completion Date:5/12/2004
Spud Date:3/22/2004Spud Date Is:ACTUAL
Measured TD:6090 ft.Measured PB depth:5900 ft.
True Vertical TD:6090 ft.True Vertical PB depth:5900 ft.
Log Types:HIGH RESOLUTION INDUCTION; SPECTRAL DENSITY/DUAL SPACED NEUTRON, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1116 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 355, Top: 0 ft., Bottom: 1116 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6080 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 726, Top: 1100 ft., Bottom: 6090 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.NN
WILLIAMS FORK3221 ft.NN
ROLLINS5974 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 8/1/2020                  Interval Top: 4244 ft.    Interval Bottom: 5752 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:5/12/2004Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:7/9/2014Treatment End Date:7/10/2014
Treatment Summary:CBP @ 4150' W/ 2 SX CEMENT DRILLED OUT.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:8/16/2013Treatment End Date:8/16/2013
Treatment Summary:SET CBP @ 4150' AND TOPPED WITH 2 SX CEMENT AFTER FIRST PLUG AT 4280' RESULTED IN BAD PRESSURE TEST.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/12/2004
Treatment Summary:FRACED WITH 785,460# 20/40 SAND, 15,624 BBLS FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 220
BBLS_OIL 0
CALC_BBLS_H2O 220
CALC_BBLS_OIL 0
CALC_GOR 103400
CALC_MCF_GAS 1034
CASING_PRESS 1000
MCF_GAS 1034
TUBING_PRESS 640
Perforation Data:
Interval Top:4244 ft.# Of Holes:150
Interval Bottom:5752 ft.Hole Size:3.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)19634
GOR892454
GOR DeterminationMCFE
Average BOE per Day9.334
Average MCFE per Day54.142

 Federal Financial Assurance  i Y

 Tribal Well  i No