Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09802
Well Classification: GW Status: PR - 6/16/2004
Well Name/No:S.PARACHUTE FEDERAL #25-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/16/2004
FacilityID:270906LocationID:334096
County:GARFIELD #045Location:NESW 25 7S96W 6
Field:PARACHUTE - #67350Elevation:5944 ft.
Basin:PICEANCE BASIN  
Planned Location:1646FSL  1970 FWLLat/Long: 39.405840 / -108.060684Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.405920 / -108.060510Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/16/2004             Measured TD: 6182 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/16/2004
Wellbore Permit
Permit #:20032595 Expiration Date:1/19/2005
Proposed Depth/Form:6300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 139-31 , Unit Acreage: 640, Drill Unit: SEC. 2
Casing:String Type: CONDUCTOR, Hole Size: 16 in., Size: 13.375 in., Top: , Depth: 90 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 10, Top: 0 ft., Bottom: 90 ft.

Wellbore Completed
Completion Date:4/24/2004
Spud Date:3/12/2004Spud Date Is:ACTUAL
Measured TD:6182 ft.Measured PB depth:6010 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SPECTRAL DENSITY/DUAL SPECED NEUTRON; HIGH RESOLUTION INDUCTION
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1117 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 1117 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6175 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 755, Top: 2800 ft., Bottom: 6182 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2018 ft.NN
WILLIAMS FORK3311 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 6/16/2004                 Interval Top: 4092 ft.    Interval Bottom: 5826 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/24/2004
Treatment Summary:STAGE 1: PERFED 5612-5826. FRACED DOWN 5.5" CSG VIA DS SLICK WATER, 66,135# 20/40 SAND. 1469 BF. STAGE 2: PERFED 5337-5538. FRACED DOWN 5.5# CSG VIA DS SLICK WATER, 35,906# 20/40 SAND. 2582 BF. STAGE 3: PERFED 4950-5212. FRACED DOWN 5.5# CSG VIA DS-CON'T
Tubing Size:2.375 in.Tubing Setting Depth:5552 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 0
CALC_BBLS_H2O 100
CALC_BBLS_OIL 0
CALC_GOR 197700
CALC_MCF_GAS 1977
CASING_PRESS 1300
MCF_GAS 1977
TUBING_PRESS 975
Perforation Data:
Interval Top:4092 ft.# Of Holes:124
Interval Bottom:5826 ft.Hole Size:3.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8982
GOR
GOR DeterminationMCFE
Average BOE per Day4.249
Average MCFE per Day24.621

 Federal Financial Assurance  i Y

 Tribal Well  i No