Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09778
Well Classification: GW Status: PR - 6/4/2004
Well Name/No:CLOUGH #RWF 332-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/4/2004
FacilityID:270640LocationID:335340
County:GARFIELD #045Location:SWNE 21 6S94W 6
Field:RULISON - #75400Elevation:5395 ft.
Basin:PICEANCE BASIN  
Planned Location:1811FNL  1920 FELLat/Long: 39.513119 / -107.890740Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.513192 / -107.890836Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/4/2004             Measured TD: 7991 ft.    Vertical TD: 7981 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/4/2004
Wellbore Permit
Permit #:20032462 Expiration Date:12/29/2004
Proposed Top PZ Location:Sec: Twp: Footage: 2088 FNL  1882 FEL
Bottom Hole Location:Sec: Twp: Footage: 2088 FNL  1885 FEL
Proposed Depth/Form:7750 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:4/29/2004
Spud Date:2/29/2004Spud Date Is:ACTUAL
Measured TD:7991 ft.Measured PB depth:7319 ft.
True Vertical TD:7981 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2088 FNL  1882 FEL
Bottom Hole Location:Sec: Twp: Footage: 2088 FNL  1885 FEL
Log Types:HIGH RESOLUTION IND., SPECTRAL DEN.DUAL SPACED NEU,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1127 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: , Bottom: 1126 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7990 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: 3880 ft., Bottom: 7990 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1666 ft.NN
MESAVERDE4156 ft.NN
CAMEO6933 ft.NN
ROLLINS7842 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/4/2004                  Interval Top: 5575 ft.    Interval Bottom: 7595 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/29/2004
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6930 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/4/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1114
CALC_MCF_GAS 1385
CASING_PRESS 1505
MCF_GAS 1385
TUBING_PRESS 1390
Perforation Data:
Interval Top:5575 ft.# Of Holes:104
Interval Bottom:7595 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)59
Total Gas Produced (MCF)20601
GOR349169
GOR DeterminationMCFE
Average BOE per Day9.897
Average MCFE per Day57.387

 Federal Financial Assurance  i 

 Tribal Well  i No