Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09564
Well Classification: OW Status: PR - 2/12/2005
Well Name/No:PA #341-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/12/2005
FacilityID:270605LocationID:334912
County:GARFIELD #045Location:NENE 6 7S95W 6
Field:PARACHUTE - #67350Elevation:5205 ft.
Basin:PICEANCE BASIN  
Planned Location:372FNL  361 FELLat/Long: 39.472909 / -108.032374Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.472902 / -108.032387Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/12/2005             Measured TD: 6605 ft.    Vertical TD: 6571 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/12/2005
Wellbore PermitDIRECTIONAL
Permit #:20032466 Expiration Date:12/28/2004
Proposed Top PZ Location:Sec: Twp: Footage: 840 FNL  610 FEL
Bottom Hole Location:Sec: Twp: Footage: 840 FNL  614 FEL
Proposed Depth/Form:6645 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:1/1/2005
Spud Date:11/16/2004Spud Date Is:ACTUAL
Measured TD:6605 ft.Measured PB depth:6582 ft.
True Vertical TD:6571 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 840 FNL  610 FEL
Bottom Hole Location:Sec: Twp: Footage: 840 FNL  614 FEL
Log Types:RESERVOIR PERFORMANCE MONITOR, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1129 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 0 ft., Bottom: 1128 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6606 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 2750 ft., Bottom: 6605 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1436 ft.NN
FORT UNION1735 ft.NN
MESAVERDE3450 ft.NN
CAMEO6022 ft.NN
ROLLINS6568 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 2/12/2005                 Interval Top: 4623 ft.    Interval Bottom: 6480 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/1/2005
Treatment Summary:4000 GALS 7 1/2% HCL,568519# 30/50, 13199 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5960 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/12/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 910
CASING_PRESS 1043
MCF_GAS 910
TUBING_PRESS 940
Perforation Data:
Interval Top:4623 ft.# Of Holes:85
Interval Bottom:6480 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)17691
GOR737125
GOR DeterminationMCFE
Average BOE per Day8.424
Average MCFE per Day48.841

 Federal Financial Assurance  i 

 Tribal Well  i No