|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2025 Measured TD: 7960 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2025 | | Wellbore Permit | | | Permit #: | 20032278 | Expiration Date: | 12/14/2004 | | Proposed Depth/Form: | 8200 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-31/40 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: CONDUCTOR, Hole Size: 16 in., Size: 13.375 in., Top: , Depth: 90 ft., Weight: 54 , Citings Type: PLANNED | | Cement: | Sacks: 10, Top: 0 ft., Bottom: 90 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/20/2004 | | Spud Date: | 5/11/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7960 ft. | Measured PB depth: | 7850 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/BOND, IND/GR/CL, CD/CN/GR/CL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1115 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 346, Top: 0 ft., Bottom: 1115 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7925 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1480, Top: 1120 ft., Bottom: 7960 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2648 ft. | | N | N | | WILLIAMS FORK | 4748 ft. | | N | N | | CAMEO | 7311 ft. | | N | N | | ROLLINS | 7839 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 5/1/2025 Interval Top: 5288 ft. Interval Bottom: 7748 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/20/2004 | | Treatment Summary: | ALL STAGES FRAC'D W/ SLICKWATER. STAGE: 1:7550-7748' (30 HOLES), 94000# 20/40 SD, 500 GALS 15% HCL. STAGE 2: 7000-7324' (20 HOLES), 50000# 20/40 SD, 500 GAL HCL. STAGE 3: 6754-6875' (22 HOLES), 100000# 20/40 SD. STAGE 4: 6628-6678' (20 HOLES), 56000# 20/40 SD. STAGE 5: 6264-6430' (22 HOLES), 92000# 20/40 SD. STAGE 6: 5963-6082' (22 HOLES), 56000# 20/40 SD. STAGE 7: 5754-5898' (24 HOLES), 83649# 20/40 SD. STAGE 8: 5465-5561' (24 HOLES), 60000# 20/40 SD. STAGE 9: 5288-5327' (22 HOLES), 61480# 20/40 SD. DRILL OUT CFPS. CLEAN HOLE TO 7850'. LAND TBG AND FLOW BACK. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7479 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/30/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1360 | | CASING_PRESS | 1000 | | MCF_GAS | 1360 | | TUBING_PRESS | 720 |
| | Perforation Data: | | Interval Top: | 5288 ft. | # Of Holes: | 206 | | Interval Bottom: | 7748 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1 |
| Total Gas Produced (MCF) | 13585 |
| GOR | 13585000 |
| GOR Determination | MCFE |
| Average BOE per Day | 6.372 |
| Average MCFE per Day | 36.964 |
| Federal Financial Assurance | i | Y |
|
|