Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09547
Well Classification: GW Status: PR - 12/12/2003
Well Name/No:ST. PARACHUTE TBI #36-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/12/2003
FacilityID:270393LocationID:334084
County:GARFIELD #045Location:NESW 36 7S96W 6
Field:PARACHUTE - #67350Elevation:5639 ft.
Basin:PICEANCE BASIN  
Planned Location:1950FSL  2470 FWLLat/Long: 39.392040 / -108.058844Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.392110 / -108.058820Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/20/2003             Measured TD: 5790 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/20/2003
Wellbore Permit
Permit #:20032367 Expiration Date:12/11/2004
Proposed Depth/Form:6500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 13-31 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 16 in., Size: 13.375 in., Top: , Depth: 90 ft., Weight: 54 , Citings Type: PLANNED
Cement:Sacks: 10, Top: 0 ft., Bottom: 90 ft.

Wellbore Completed
Completion Date:3/11/2004
Spud Date:1/11/2004Spud Date Is:ACTUAL
Measured TD:5790 ft.Measured PB depth:5740 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL - FDC - CNL - SP - GR - CAL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1621 ft.NN
WILLIAMS FORK2866 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 3/11/2004                 Interval Top: 2866 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/11/2004
Treatment Summary:STAGE 1; PERFED 5252-5408' FRACED DN 5.5" CSG VIA DS SLICKWATER, 80,345# 20/40 SAND. STAGE 2; PERFED 5039-5105'. FRACED DN 5.5" CSG VIA DS SLICKWATER, 78,058# 20/40 SAND. STAGE 3; PERFED 4876-4937'. FRACED DN 5.5" CSG VIA DS SLICKWATER, 54,000# 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:5029 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/11/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 60
CASING_PRESS 1000
MCF_GAS 1763
TUBING_PRESS 800
No Perforation Data was found for formation WMFK.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9968
GOR830666
GOR DeterminationMCFE
Average BOE per Day4.746
Average MCFE per Day27.537

 Federal Financial Assurance  i Y

 Tribal Well  i No