Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09545
Well Classification: OW Status: PR - 5/13/2004
Well Name/No:PA #523-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/13/2004
FacilityID:270390LocationID:335299
County:GARFIELD #045Location:NESW 34 6S95W 6
Field:PARACHUTE - #67350Elevation:5204 ft.
Basin:PICEANCE BASIN  
Planned Location:2066FSL  1752 FWLLat/Long: 39.479484 / -107.987581Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.479121 / -107.987537Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/13/2004             Measured TD: 7075 ft.    Vertical TD: 7039 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/13/2004
Wellbore PermitDIRECTIONAL
Permit #:20032364 Expiration Date:12/11/2004
Proposed Top PZ Location:Sec: Twp: Footage: 1397 FSL  1950 FWL
Bottom Hole Location:Sec: Twp: Footage: 1397 FSL  1950 FWL
Proposed Depth/Form:7040 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:4/1/2000
Spud Date:3/17/2004Spud Date Is:ACTUAL
Measured TD:7075 ft.Measured PB depth:6975 ft.
True Vertical TD:7039 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1397 FSL  1950 FWL
Bottom Hole Location:Sec: Twp: Footage: 1397 FSL  1950 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE (CASED HOLE PULSED NEUTRON), CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1632 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 0 ft., Bottom: 1631 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7063 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 957, Top: 1580 ft., Bottom: 7062 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1401 ft.NN
FORT UNION1755 ft.NN
MESAVERDE3588 ft.NN
CAMEO6225 ft.NN
ROLLINS6919 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 5/13/2004                 Interval Top: 5008 ft.    Interval Bottom: 6840 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/2000
Treatment Summary:SIZE ALSO .43. SEE OGCC COMMENTS FOR FORMATION TREATMENT
Tubing Size:2.375 in.Tubing Setting Depth:6700 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/13/2004Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1635
CASING_PRESS 1641
TUBING_PRESS 1576
Perforation Data:
Interval Top:5008 ft.# Of Holes:77
Interval Bottom:6840 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)10681
GOR821615
GOR DeterminationMCFE
Average BOE per Day5.078
Average MCFE per Day29.484

 Federal Financial Assurance  i 

 Tribal Well  i No