Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09540
Well Classification: GW Status: PR - 4/26/2005
Well Name/No:GIBSON GULCH UNIT #12-30 D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/26/2005
FacilityID:270374LocationID:335277
County:GARFIELD #045Location:SWSW 30 6S91W 6
Field:MAMM CREEK - #52500Elevation:5904 ft.
Basin:PICEANCE BASIN  
Planned Location:673FSL  655 FWLLat/Long: 39.492991 / -107.603751Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.493083 / -107.603610Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/26/2005             Measured TD: 7254 ft.    Vertical TD: 7199 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/26/2005
Wellbore Permit
Permit #:20032344 Expiration Date:12/10/2004
Proposed Depth/Form:7472 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/4/2005
Spud Date:1/2/2004Spud Date Is:ACTUAL
Measured TD:7254 ft.Measured PB depth:
True Vertical TD:7199 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1192 FSL  653 FWL
Bottom Hole Location:Sec: Twp: Footage: 1170 FSL  654 FWL
Log Types:TRIPLE COMBO/XTP
Log Types:TRIPLE COMBO / XTP
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 864 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 864 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7245 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 880, Top: 3768 ft., Bottom: 7245 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3391 ft.NN
ROLLINS7004 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 4/26/2005                 Interval Top: 4933 ft.    Interval Bottom: 6966 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.281 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/4/2005
Treatment Summary:163 TONS CO2, 267,199 LBS. 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:5360 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/11/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 192
MCF_GAS 192
Perforation Data:
Interval Top:4933 ft.# Of Holes:100
Interval Bottom:6966 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1513
GOR
GOR DeterminationMCFE
Average BOE per Day0.715
Average MCFE per Day4.147

 Federal Financial Assurance  i 

 Tribal Well  i No