Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09491
Well Classification: GW Status: PR - 9/1/2004
Well Name/No:PUCKETT #22B-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2004
FacilityID:270198LocationID:324253
County:GARFIELD #045Location:SENW 1 7S97W 6
Field:GRAND VALLEY - #31290Elevation:8293 ft.
Basin:PICEANCE BASIN  
Planned Location:1815FNL  1980 FWLLat/Long: 39.476788 / -108.170818Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.476810 / -108.170979Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2004             Measured TD: 8785 ft.    Vertical TD: 8785 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2004
Wellbore Permit
Permit #:20032172 Expiration Date:11/23/2004
Proposed Depth/Form:9000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/18/2004
Spud Date:3/20/2004Spud Date Is:ACTUAL
Measured TD:8785 ft.Measured PB depth:8810 ft.
True Vertical TD:8785 ft.True Vertical PB depth:8810 ft.
Log Types:GR, CNL, SONIC DIPOLE,CCL,CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 0 in., Top: 100 ft., Depth: 0 ft., Weight: 100 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: , Bottom: , Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2656 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 2656 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8810 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 5695 ft., Bottom: 8810 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4300 ft.NN
FORT UNION4603 ft.NN
WILLIAMS FORK5944 ft.NN
CAMEO8145 ft.NN
ROLLINS8637 ft.NN

Formation CMEO                     Formation Classification:  GW                     Status:  CM - 9/1/2004                  Interval Top: 8209 ft.    Interval Bottom: 8547 ft.

 Completed Information for Formation CAMEO
1st Production Date:9/1/2004Choke Size:0.313 in.
Formation Name:CAMEOCommingled:No
Production Method:FLOWIING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/18/2004
Treatment Summary:8/18/04 BJ SERVICES FRACED W/1053 BBL OF 22# LIGHTING AND 117780# OF 20/40 AND 2956# OF 14/30 FLEX SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7511 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2004Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 0
CALC_BBLS_H2O 8
CALC_BBLS_OIL 0
CALC_MCF_GAS 800
CASING_PRESS 1500
MCF_GAS 800
TUBING_PRESS 1125
Perforation Data:
Interval Top:8209 ft.# Of Holes:16
Interval Bottom:8547 ft.Hole Size:0.34 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 9/1/2004                  Interval Top: 7131 ft.    Interval Bottom: 8033 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:9/1/2004Choke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/18/2004
Treatment Summary:8/18/04 BJ SERVICES FRACED W/5025 BBL OF 22# LIGHTING 533180# OF 20/40 SAND AND 18157# OF 14/30 FLEX SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7511 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2004Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 0
CALC_BBLS_H2O 8
CALC_BBLS_OIL 0
CALC_MCF_GAS 800
CASING_PRESS 1500
MCF_GAS 800
TUBING_PRESS 1125
Perforation Data:
Interval Top:7131 ft.# Of Holes:60
Interval Bottom:8033 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2004

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/1/2004Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
No Perforation Data was found for formation WFCM.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)15245
GOR
GOR DeterminationMCFE
Average BOE per Day7.201
Average MCFE per Day41.759

 Federal Financial Assurance  i 

 Tribal Well  i No