|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2004 Measured TD: 8785 ft. Vertical TD: 8785 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2004 | | Wellbore Permit | | | Permit #: | 20032172 | Expiration Date: | 11/23/2004 | | Proposed Depth/Form: | 9000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 8/18/2004 | | Spud Date: | 3/20/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 8785 ft. | Measured PB depth: | 8810 ft. | | True Vertical TD: | 8785 ft. | True Vertical PB depth: | 8810 ft. | | Log Types: | GR, CNL, SONIC DIPOLE,CCL,CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 0 in., Top: 100 ft., Depth: 0 ft., Weight: 100 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: , Bottom: , Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2656 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 2656 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8810 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 5695 ft., Bottom: 8810 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4300 ft. | | N | N | | FORT UNION | 4603 ft. | | N | N | | WILLIAMS FORK | 5944 ft. | | N | N | | CAMEO | 8145 ft. | | N | N | | ROLLINS | 8637 ft. | | N | N |
Formation CMEO Formation Classification: GW Status: CM - 9/1/2004 Interval Top: 8209 ft. Interval Bottom: 8547 ft.| Completed Information for Formation CAMEO | | 1st Production Date: | 9/1/2004 | Choke Size: | 0.313 in. | | Formation Name: | CAMEO | Commingled: | No | | Production Method: | FLOWIING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2004 | | Treatment Summary: | 8/18/04 BJ SERVICES FRACED W/1053 BBL OF 22# LIGHTING AND 117780# OF 20/40 AND 2956# OF 14/30 FLEX SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7511 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/30/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 800 | | CASING_PRESS | 1500 | | MCF_GAS | 800 | | TUBING_PRESS | 1125 |
| | Perforation Data: | | Interval Top: | 8209 ft. | # Of Holes: | 16 | | Interval Bottom: | 8547 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 9/1/2004 Interval Top: 7131 ft. Interval Bottom: 8033 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 9/1/2004 | Choke Size: | 0.313 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2004 | | Treatment Summary: | 8/18/04 BJ SERVICES FRACED W/5025 BBL OF 22# LIGHTING 533180# OF 20/40 SAND AND 18157# OF 14/30 FLEX SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7511 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/30/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 800 | | CASING_PRESS | 1500 | | MCF_GAS | 800 | | TUBING_PRESS | 1125 |
| | Perforation Data: | | Interval Top: | 7131 ft. | # Of Holes: | 60 | | Interval Bottom: | 8033 ft. | Hole Size: | 0.34 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 9/1/2004| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/1/2004 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | No Perforation Data was found for formation WFCM. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 15245 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 7.201 |
| Average MCFE per Day | 41.759 |
| Federal Financial Assurance | i | |
|
|