|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/7/2004 Measured TD: 6790 ft. Vertical TD: 6760 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/7/2004 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20032109 | Expiration Date: | 11/18/2004 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 838 FSL 1888 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 837 FSL 1881 FWL | | Proposed Depth/Form: | 6800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1448 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1448 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6800 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 3/9/2004 | | Spud Date: | 1/20/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 6790 ft. | Measured PB depth: | 6748 ft. | | True Vertical TD: | 6760 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 838 FSL 1888 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 837 FSL 1881 FWL | | Log Types: | DUAL INDUCTION, NEOTRON DENSITLY, CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1250 ft. | | N | N | | FORT UNION | 1569 ft. | | N | N | | MESAVERDE | 3341 ft. | | N | N | | CAMEO | 6032 ft. | | N | N | | ROLLINS | 6703 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 4/7/2004 Interval Top: 4803 ft. Interval Bottom: 6621 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.203 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/9/2004 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6205 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/7/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 1471 | | CASING_PRESS | 1570 | | MCF_GAS | 1471 | | TUBING_PRESS | 1558 |
| | Perforation Data: | | Interval Top: | 4803 ft. | # Of Holes: | 93 | | Interval Bottom: | 6621 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 12 |
| Total Gas Produced (MCF) | 11469 |
| GOR | 955750 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.452 |
| Average MCFE per Day | 31.621 |
| Federal Financial Assurance | i | |
|
|