Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09458
Well Classification: GW Status: PR - 4/18/2004
Well Name/No:PA #531-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/18/2004
FacilityID:270119LocationID:335333
County:GARFIELD #045Location:NWNE 34 6S95W 6
Field:PARACHUTE - #67350Elevation:5442 ft.
Basin:PICEANCE BASIN  
Planned Location:404FNL  2224 FELLat/Long: 39.487239 / -107.983223Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.487315 / -107.983369Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/18/2004             Measured TD: 7680 ft.    Vertical TD: 7618 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/18/2004
Wellbore PermitDIRECTIONAL
Permit #:20032112 Expiration Date:11/18/2004
Proposed Top PZ Location:Sec: Twp: Footage: 977 FNL  2004 FEL
Bottom Hole Location:Sec: Twp: Footage: 636 FNL  2122 FEL
Proposed Depth/Form:7605 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:3/4/2004
Spud Date:12/31/2003Spud Date Is:ACTUAL
Measured TD:7680 ft.Measured PB depth:7628 ft.
True Vertical TD:7618 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 977 FNL  2004 FEL
Bottom Hole Location:Sec: Twp: Footage: 636 FNL  2122 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, ULTRSONIC IMAGING TOOL CEMENT EVALUATION (CBL), ACOUSTIC CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2105 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 825, Top: 0 ft., Bottom: 2104 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7669 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 946, Top: 3450 ft., Bottom: 7669 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1865 ft.NN
FORT UNION2185 ft.NN
MESAVERDE4180 ft.NN
CAMEO6858 ft.NN
ROLLINS7592 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/18/2004                 Interval Top: 5602 ft.    Interval Bottom: 7518 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/4/2004
Treatment Summary:1000 GALS 7 1/2% HCI, 96675# 20/40, 1825 BBLS SLICK WATER // 800 GALS 7 1/2% HCL, 153250# 20/40, 3479 BBLS SLICK WATER // 500 GALS 7 /12% HCL, 108486# 20/40, 2134 BBLS SLICK WATER // 1000 GALS 7 1/2% HCL, 100287# 20/40, 1826 BBLS SLICK WATER //500 GALS 7 1/2% HCL, 105981# 20/40, 2025 BBLS SLICK WATER // 1000 GALS 7 1/2% HCI, 84207# 20/40, 1653 BBLS SLICK WATER // 300 GALS 7 1/2% HCI, 83665# 20/40, 1722 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:6924 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/18/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_MCF_GAS 1220
CASING_PRESS 1328
MCF_GAS 1220
TUBING_PRESS 1190
Perforation Data:
Interval Top:5602 ft.# Of Holes:115
Interval Bottom:7518 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)8604
GOR717000
GOR DeterminationMCFE
Average BOE per Day4.099
Average MCFE per Day23.770

 Federal Financial Assurance  i 

 Tribal Well  i No