Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09393
Well Classification: GW Status: PR - 9/4/2003
Well Name/No:BORUCH #GM 13-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/4/2003
FacilityID:269665LocationID:334984
County:GARFIELD #045Location:NESE 11 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5258 ft.
Basin:PICEANCE BASIN  
Planned Location:2014FSL  664 FELLat/Long: 39.450219 / -108.070325Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.450332 / -108.070519Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/4/2003             Measured TD: 6217 ft.    Vertical TD: 6105 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/4/2003
Wellbore PermitDIRECTIONAL
Permit #:20031747 Expiration Date:10/5/2004
Proposed Top PZ Location:Sec:12 Twp: 7S 96W Footage: 1950 FSL  224 FWL
Bottom Hole Location:Sec:12 Twp: 7S 96W Footage: 1948 FSL  250 FWL
Proposed Depth/Form:6210 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-10 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:1/12/2004
Spud Date:12/12/2003Spud Date Is:ACTUAL
Measured TD:6217 ft.Measured PB depth:6176 ft.
True Vertical TD:6105 ft.True Vertical PB depth:
Top PZ Location:Sec:12 Twp: 7S 96WFootage: 1950 FSL  224 FWL
Bottom Hole Location:Sec:12 Twp: 7S 96WFootage: 1948 FSL  250 FWL
Log Types:DUAL IND., SPECTRAL DEN.- DUAL SPACED NEU.,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 973 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 973 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6207 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 3200 ft., Bottom: 6206 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1394 ft.NN
FORT UNION1691 ft.NN
MESAVERDE3153 ft.NN
CAMEO COAL5693 ft.NN
ROLLINS6132 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2013                  Interval Top: 4426 ft.    Interval Bottom: 6053 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/12/2004
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:5483 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/10/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1344
CASING_PRESS 1619
MCF_GAS 1344
TUBING_PRESS 1523
Perforation Data:
Interval Top:4426 ft.# Of Holes:71
Interval Bottom:6053 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9143
GOR761916
GOR DeterminationMCFE
Average BOE per Day4.351
Average MCFE per Day25.248

 Federal Financial Assurance  i 

 Tribal Well  i No