|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2025 Measured TD: 7051 ft. Vertical TD: 7048 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20031566 | Expiration Date: | 9/17/2004 | | Proposed Top PZ Location: | Sec:17 Twp: 7W 96W | Footage: 805 FNL 679 FWL | | Bottom Hole Location: | Sec:17 Twp: 7S 96W | Footage: 805 FNL 679 FWL | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMRCM , Formation: WILLIAMS FK-ROLLINS-CAMEO , Order: 510-1 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 5/12/2004 | | Spud Date: | 5/11/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7051 ft. | Measured PB depth: | 7032 ft. | | True Vertical TD: | 7048 ft. | True Vertical PB depth: | 7029 ft. | | Top PZ Location: | Sec:17 Twp: 7W 96W | Footage: 805 FNL 679 FWL | | Bottom Hole Location: | Sec:17 Twp: 7S 96W | Footage: 805 FNL 679 FWL | | Log Types: | DIPOLE SONIC IMAGER, COMP NEUTRON, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2798 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 2798 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7032 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 3350 ft., Bottom: 7032 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2510 ft. | | N | N | | FORT UNION | 2750 ft. | | N | N | | WILLIAMS FORK | 3915 ft. | | N | N | | CAMEO | 6342 ft. | | N | N | | ROLLINS | 6798 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: SI - 4/1/2025 Interval Top: 5340 ft. Interval Bottom: 6612 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/12/2004 | | Treatment Summary: | 11/16-17/04 B J SERVICES PERFORMED AN HUYDRO FRAC WITH 3888 BBLS OF LIGHTING 22# GEL SYSTEM USING 4313932# OF 20/40 FRAC SAND AND 13006# OF RESIN COATED MSE 14/30 MESH SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6602 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/31/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 0 | | BTU_GAS | 1049 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 551 | | CASING_PRESS | 1557 | | MCF_GAS | 551 | | TUBING_PRESS | 1555 |
| | Perforation Data: | | Interval Top: | 5340 ft. | # Of Holes: | 50 | | Interval Bottom: | 6612 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 10 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.005 |
| Average MCFE per Day | 0.027 |
| Federal Financial Assurance | i | |
|
|