Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09368
Well Classification: GW Status: PR - 10/1/2024
Well Name/No:PUCKETT #21C-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:269452LocationID:335105
County:GARFIELD #045Location:NENW 25 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8326 ft.
Basin:PICEANCE BASIN  
Planned Location:825FNL  1980 FWLLat/Long: 39.498938 / -108.171008Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.498938 / -108.171073Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2024             Measured TD: 9100 ft.    Vertical TD: 9100 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2024
Wellbore Permit
Permit #:20031575 Expiration Date:9/17/2004
Proposed Depth/Form:9500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 210-1 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/14/2004
Spud Date:8/18/2004Spud Date Is:ACTUAL
Measured TD:9100 ft.Measured PB depth:9043 ft.
True Vertical TD:9100 ft.True Vertical PB depth:9043 ft.
Log Types:GR, COMP NEUTRONL,SONIC DIPOLE,CCL,CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2856 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 2856 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9043 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 5321 ft., Bottom: 9043 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4299 ft.NN
FORT UNION4816 ft.NN
WILLIAMS FORK6248 ft.NN
CAMEO8513 ft.NN
ROLLINS8924 ft.NN

Formation CMEO                     Formation Classification:  GW                     Status:  CM - 9/1/2004                  Interval Top: 8574 ft.    Interval Bottom: 8728 ft.

 Completed Information for Formation CAMEO
1st Production Date:8/31/2004Choke Size:0.313 in.
Formation Name:CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2004
Treatment Summary:7/14/04 BJ SERVICES FRACED WITH 1899 BBL OF 22# LIGHTING AND 168692# OF 20/40 AND 6000# OF 14/30 FLEX SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7150 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2004Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 0
CALC_BBLS_H2O 8
CALC_BBLS_OIL 0
CALC_MCF_GAS 171
CASING_PRESS 1462
MCF_GAS 171
TUBING_PRESS 1217
Perforation Data:
Interval Top:8574 ft.# Of Holes:16
Interval Bottom:8728 ft.Hole Size:0.34 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 9/1/2004                  Interval Top: 6827 ft.    Interval Bottom: 8034 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/31/2004Choke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2004
Treatment Summary:7/14/04 BJ SERVICES FRACED WITH 6543 BBL OF 22# LIGHTING 593923# OF 20/40 SAND AND 17008# OF 14/30 FKEX SABD,
Tubing Size:2.375 in.Tubing Setting Depth:7150 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2004Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 0
CALC_BBLS_H2O 8
CALC_BBLS_OIL 0
CALC_MCF_GAS 171
CASING_PRESS 1462
MCF_GAS 171
TUBING_PRESS 1217
Perforation Data:
Interval Top:6827 ft.# Of Holes:46
Interval Bottom:8034 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/1/2024

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/31/2004Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
No Perforation Data was found for formation WFCM.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)107
Total Gas Produced (MCF)14359
GOR134196
GOR DeterminationMCFE
Average BOE per Day7.074
Average MCFE per Day41.009

 Federal Financial Assurance  i 

 Tribal Well  i No