Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09322
Well Classification: GW Status: PR - 8/1/2024
Well Name/No:PUCKETT #34C-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:269126LocationID:324235
County:GARFIELD #045Location:SWSE 25 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8259 ft.
Basin:PICEANCE BASIN  
Planned Location:551FSL  1953 FELLat/Long: 39.488298 / -108.166148Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.488287 / -108.166311Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2024             Measured TD: 8973 ft.    Vertical TD: 8929 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2024
Wellbore Permit
Permit #:20031397 Expiration Date:8/19/2004
Proposed Depth/Form:9300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/1/2004
Spud Date:5/26/2004Spud Date Is:ACTUAL
Measured TD:8973 ft.Measured PB depth:
True Vertical TD:8929 ft.True Vertical PB depth:
Log Types:GR, COMP NEUTRON, SONIC DIPOLE,CCL,CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2679 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 2679 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8929 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 6181 ft., Bottom: 8929 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4349 ft.NN
FORT UNION4696 ft.NN
WILLIAMS FORK6140 ft.NN
CAMEO8372 ft.NN
ROLLINS8801 ft.NN

Formation CMEO                     Formation Classification:  GW                     Status:  CM - 11/4/2004                 Interval Top: 8422 ft.    Interval Bottom: 8649 ft.

 Completed Information for Formation CAMEO
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/1/2004
Treatment Summary:9/1/04 BJ SERVICES FRACED W/2279 BBL OF 22# LIGHTING AND 201500# OF 20/40 AND 6000# OF 14/30 FLEX SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7350 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/4/2004Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 0
CALC_BBLS_H2O 15
CALC_BBLS_OIL 0
CALC_MCF_GAS 997
CASING_PRESS 2241
MCF_GAS 997
TUBING_PRESS 1946
Perforation Data:
Interval Top:8422 ft.# Of Holes:18
Interval Bottom:8649 ft.Hole Size:0.34 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 11/1/2004                 Interval Top: 7382 ft.    Interval Bottom: 8295 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/1/2004
Treatment Summary:9/1/04 BJ SERVICES FRACED WITH 5344 BBL OF 22# LIGHTING 501000# OF 20/40 SNAD AND 12000# OF 14/30 FLEX SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7350 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/1/2004Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 0
CALC_BBLS_H2O 15
CALC_BBLS_OIL 0
CALC_MCF_GAS 997
CASING_PRESS 2241
MCF_GAS 997
TUBING_PRESS 1946
Perforation Data:
Interval Top:7382 ft.# Of Holes:46
Interval Bottom:8295 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/1/2024

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/30/2004Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
No Perforation Data was found for formation WFCM.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)31430
GOR
GOR DeterminationMCFE
Average BOE per Day14.863
Average MCFE per Day86.219

 Federal Financial Assurance  i 

 Tribal Well  i No