|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2024 Measured TD: 8973 ft. Vertical TD: 8929 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2024 | | Wellbore Permit | | | Permit #: | 20031397 | Expiration Date: | 8/19/2004 | | Proposed Depth/Form: | 9300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/1/2004 | | Spud Date: | 5/26/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 8973 ft. | Measured PB depth: | | | True Vertical TD: | 8929 ft. | True Vertical PB depth: | | | Log Types: | GR, COMP NEUTRON, SONIC DIPOLE,CCL,CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2679 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 2679 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8929 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 6181 ft., Bottom: 8929 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4349 ft. | | N | N | | FORT UNION | 4696 ft. | | N | N | | WILLIAMS FORK | 6140 ft. | | N | N | | CAMEO | 8372 ft. | | N | N | | ROLLINS | 8801 ft. | | N | N |
Formation CMEO Formation Classification: GW Status: CM - 11/4/2004 Interval Top: 8422 ft. Interval Bottom: 8649 ft.| Completed Information for Formation CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | CAMEO | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/1/2004 | | Treatment Summary: | 9/1/04 BJ SERVICES FRACED W/2279 BBL OF 22# LIGHTING AND 201500# OF 20/40 AND 6000# OF 14/30 FLEX SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7350 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/4/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 997 | | CASING_PRESS | 2241 | | MCF_GAS | 997 | | TUBING_PRESS | 1946 |
| | Perforation Data: | | Interval Top: | 8422 ft. | # Of Holes: | 18 | | Interval Bottom: | 8649 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 11/1/2004 Interval Top: 7382 ft. Interval Bottom: 8295 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/1/2004 | | Treatment Summary: | 9/1/04 BJ SERVICES FRACED WITH 5344 BBL OF 22# LIGHTING 501000# OF 20/40 SNAD AND 12000# OF 14/30 FLEX SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7350 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/1/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 997 | | CASING_PRESS | 2241 | | MCF_GAS | 997 | | TUBING_PRESS | 1946 |
| | Perforation Data: | | Interval Top: | 7382 ft. | # Of Holes: | 46 | | Interval Bottom: | 8295 ft. | Hole Size: | 0.34 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 8/1/2024| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/30/2004 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | No Perforation Data was found for formation WFCM. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 31430 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 14.863 |
| Average MCFE per Day | 86.219 |
| Federal Financial Assurance | i | |
|
|