Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09316
Well Classification: GW Status: PR - 8/13/2003
Well Name/No:BENTLEY #11-14D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/13/2003
FacilityID:269088LocationID:334625
County:GARFIELD #045Location:SWNE 11 7S95W 6
Field:PARACHUTE - #67350Elevation:6260 ft.
Basin:PICEANCE BASIN  
Planned Location:2062FNL  1738 FELLat/Long: 39.453850 / -107.962102Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.453920 / -107.962310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/30/2003             Measured TD: 8075 ft.    Vertical TD: 7760 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/30/2003
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:8/12/2004
Proposed Top PZ Location:Sec:11 Twp: 7S 95W Footage: 660 FNL  660 FEL
Bottom Hole Location:Sec:11 Twp: 7S 95W Footage: 660 FNL  660 FEL
Proposed Depth/Form:8250 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 440-16 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:11/7/2003
Spud Date:8/19/2003Spud Date Is:ACTUAL
Measured TD:8075 ft.Measured PB depth:7933 ft.
True Vertical TD:7760 ft.True Vertical PB depth:
Top PZ Location:Sec:11 Twp: 7S 95WFootage: 660 FNL  660 FEL
Bottom Hole Location:Sec:11 Twp: 7S 95WFootage: 660 FNL  660 FEL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1520 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 415, Top: , Bottom: 1520 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8075 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: , Bottom: 8075 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK4836 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/30/2003                 Interval Top: 5686 ft.    Interval Bottom: 7876 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/7/2003
Treatment Summary:STAGE 1: PERFED 7775-7876, FRACED DN 5.5" CSG VIA DS SLICK WATER, 75,050# SAND; STAGE 2: PERFED 7393-7604', FRACED DN 5.5" VIA DS SLICK WATER, 65,700# 20/40 SD. SCREENED OUT W/57,200# SD IN FM. TF 1736 BBLS. STAGE 3: PERFED 7244-7274'. FRACED DN (CONT)
Tubing Size:2.375 in.Tubing Setting Depth:7634 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1100
MCF_GAS 1183
TUBING_PRESS 680
Perforation Data:
Interval Top:5686 ft.# Of Holes:233
Interval Bottom:7876 ft.Hole Size:3 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16906
GOR
GOR DeterminationMCFE
Average BOE per Day7.991
Average MCFE per Day46.329

 Federal Financial Assurance  i 

 Tribal Well  i No