Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09292
Well Classification: GW Status: PR - 7/1/2021
Well Name/No:CHEVERON #GM 12-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2021
FacilityID:268766LocationID:335426
County:GARFIELD #045Location:SWNW 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5744 ft.
Basin:PICEANCE BASIN  
Planned Location:1914FNL  662 FWLLat/Long: 39.511678 / -108.139628Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.511821 / -108.139529Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2021             Measured TD: 6975 ft.    Vertical TD: 6948 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20041473 Expiration Date:7/1/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1784 FNL  642 FWL
Bottom Hole Location:Sec: Twp: Footage: 1784 FNL  642 FWL
Proposed Depth/Form:7040 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:3/4/2005
Spud Date:12/25/2004Spud Date Is:ACTUAL
Measured TD:6975 ft.Measured PB depth:5953 ft.
True Vertical TD:6948 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1784 FNL  642 FWL
Bottom Hole Location:Sec: Twp: Footage: 1784 FNL  642 FWL
Log Types:HIGH RESOLUTION IND.,SPECTRAL DEN,DUAL SPACED NEU,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1116 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: , Bottom: 1116 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6971 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 990, Top: 2714 ft., Bottom: 6970 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G2172 ft.NN
FORT UNION2498 ft.NN
MESAVERDE3875 ft.NN
CAMEO COAL6410 ft.NN
ROLLINS6901 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2021                  Interval Top: 5105 ft.    Interval Bottom: 6817 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/4/2005
Treatment Summary:2500 GALS 7 1/2% HCL, 391900# 30/50, 9392 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6420 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/10/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1345
CASING_PRESS 1185
MCF_GAS 1345
TUBING_PRESS 1016
Perforation Data:
Interval Top:5105 ft.# Of Holes:71
Interval Bottom:6817 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)16216
GOR810800
GOR DeterminationMCFE
Average BOE per Day7.713
Average MCFE per Day44.760

 Federal Financial Assurance  i 

 Tribal Well  i No