Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09287
Well Classification: GW Status: PR - 3/1/2017
Well Name/No:CSF #22C-07-07-91
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 66578
Facility Status:PRStatus Date3/1/2017
FacilityID:268723LocationID:335055
County:GARFIELD #045Location:SENW 7 7S91W 6
Field:MAMM CREEK - #52500Elevation:6831 ft.
Basin:PICEANCE BASIN  
Planned Location:2110FNL  1955 FWLLat/Long: 39.463121 / -107.598861Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.463211 / -107.598952Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2017             Measured TD: 6850 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2017
Wellbore PermitDRIFTED
Permit #:20031278 Expiration Date:7/20/2004
Proposed Depth/Form:7200 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 14 in., Top: , Depth: 40 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 31, Top: 0 ft., Bottom: 40 ft.

Wellbore Completed
Completion Date:11/24/2003
Spud Date:8/14/2003Spud Date Is:ACTUAL
Measured TD:6850 ft.Measured PB depth:6660 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL LATEROLOG,SDDSNL.TMDLL,EMIL, CBL,BOREHOLE BREAKOUT ANAYLST LOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 827 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 827 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6837 ft., Weight: 12.75 , Citings Type: ACTUAL
Cement:Sacks: 2030, Top: 0 ft., Bottom: 6837 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.2439 ft.NN
OHIO CREEK2439 ft.2819 ft.NN
WILLIAMS FORK2819 ft.6349 ft.NN
CAMEO COAL6349 ft.6637 ft.NN
ROLLINS6643 ft.NN

Formation RLNS                     Formation Classification:  GW                     Status:  AB - 9/15/2009                 Interval Top: 6678 ft.    Interval Bottom: 6698 ft.

 Completed Information for Formation ROLLINS
1st Production Date:N/AChoke Size:0.281 in.
Formation Name:ROLLINSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/1/2003
Treatment Summary:RLNS: FRAC'D W/ 147,747 GALS SLICKWATER & 81,001# 20/40 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2003Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 984
BBLS_OIL 0
CALC_BBLS_H2O 984
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 302
CASING_PRESS 818
MCF_GAS 302
Perforation Data:
Interval Top:6678 ft.# Of Holes:80
Interval Bottom:6698 ft.Hole Size:0.32 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2017                  Interval Top: 4627 ft.    Interval Bottom: 6317 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/26/2005Choke Size:0.281 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/1/2003
Treatment Summary:WFCM: FRAC'D W/ 741,434 GALS SLICKWATER & 528,592 20/40 OTTAWA SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6329 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/5/2003Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 264
BBLS_OIL 96
BTU_GAS 1197
CALC_BBLS_H2O 264
CALC_BBLS_OIL 96
CALC_GOR 607
CALC_MCF_GAS 583
CASING_PRESS 975
MCF_GAS 583
TUBING_PRESS 400
Perforation Data:
Interval Top:4627 ft.# Of Holes:221
Interval Bottom:6317 ft.Hole Size:0.32 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 3/11/2009                 Interval Top: 4627 ft.    Interval Bottom: 6317 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.281 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/24/2003
Treatment Summary:FRAC'D 6069'-6315' WITH 180,343 GALS.SLICKWATER AND 112,544 LBS 20/40 OTTAWS SAND, FRAC'D 5590'-5859' WITH 183,425 GAL SLICKWATER AND 120,531 LBS.20/40 OTTAWA SAND; FRAC'D 5046'-5545' WITH 194,812 GALS. SLICKWATER AND 161,574 LBS.20/40 OTTAWA SAND, FRAC'D
Tubing Size:2.375 in.Tubing Setting Depth:6329 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/5/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 264
BBLS_OIL 96
CALC_BBLS_H2O 264
CALC_BBLS_OIL 96
CALC_GOR 6073
CALC_MCF_GAS 583
CASING_PRESS 975
MCF_GAS 583
TUBING_PRESS 400
Perforation Data:
Interval Top:4627 ft.# Of Holes:221
Interval Bottom:6317 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)10
Total Gas Produced (MCF)1574
GOR157400
GOR DeterminationMCFE
Average BOE per Day0.767
Average MCFE per Day4.474

 Federal Financial Assurance  i Y

 Tribal Well  i No