Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09277
Well Classification: GW Status: PR - 5/1/2023
Well Name/No:BATTLEMENT MESA #27-44
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:FEE
Facility Status:PRStatus Date5/1/2023
FacilityID:268622LocationID:334317
County:GARFIELD #045Location:SESE 27 7S95W 6
Field:PARACHUTE - #67350Elevation:8479 ft.
Basin:PICEANCE BASIN  
Planned Location:601FSL  176 FELLat/Long: 39.402650 / -107.974842Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.402512 / -107.974664Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2023             Measured TD: 7967 ft.    Vertical TD: 7967 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2023
Wellbore Permit
Permit #:Expiration Date:7/13/2004
Proposed Depth/Form:8700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 139-16&31 , Unit Acreage: 40, Drill Unit:
Formation And Spacing:Code: WSTCG , Formation: WASATCH G , Order: , Unit Acreage: 40, Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:10/15/2003Spud Date Is:ACTUAL
Measured TD:7967 ft.Measured PB depth:
True Vertical TD:7967 ft.True Vertical PB depth:
Log Types:TRIPLE COMBO
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1538 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 0 ft., Bottom: 1538 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: , Size: 4.5 in., Top: , Depth: , Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 205, Top: 6919 ft., Bottom: 7974 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: 4.5 in., Top: , Depth: , Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 435, Top: 2081 ft., Bottom: 4508 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: 4.5 in., Top: , Depth: , Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 4508 ft., Bottom: 6919 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.2250 ft.NN
WASATCH2250 ft.6298 ft.NN
MESAVERDE6298 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/1/2023                  Interval Top: 6835 ft.    Interval Bottom: 7848 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/29/2005
Treatment Summary:PUMPED 500 GALS OF 7 1/2% ACID FOLLOWED W/ 858710 GALS SLICKWATER & 125,730# OF 30/50 SAND W/57 TONS OF CO2.
Tubing Size:2.375 in.Tubing Setting Depth:7746 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/29/2005Test Method:PROD. EQUIP.
Hours Tested:24Gas Type:WET
Gas Disposal:
Test TypeMeasure
BBLS_H2O 148
BTU_GAS 1036
CALC_BBLS_H2O 140
CALC_BBLS_OIL 1
CALC_GOR 1500
CALC_MCF_GAS 1500
CASING_PRESS 870
MCF_GAS 1500
TUBING_PRESS 630
Perforation Data:
Interval Top:6835 ft.# Of Holes:16
Interval Bottom:7848 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)10038
GOR
GOR DeterminationMCFE
Average BOE per Day4.743
Average MCFE per Day27.519

 Federal Financial Assurance  i Y

 Tribal Well  i No