Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09267
Well Classification: GW Status: PR - 7/12/2012
Well Name/No:EM #30-2 (B30NE)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/12/2012
FacilityID:268493LocationID:335454
County:GARFIELD #045Location:NWNE 30 6S92W 6
Field:MAMM CREEK - #52500Elevation:5754 ft.
Basin:PICEANCE BASIN  
Planned Location:1018FNL  2337 FELLat/Long: 39.502010 / -107.708014Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.502070 / -107.707880Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/12/2012             Measured TD: 7560 ft.    Vertical TD: 7527 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/12/2012
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:6/30/2004
Proposed Top PZ Location:Sec: Twp: Footage: 674 FNL  2007 FEL
Bottom Hole Location:Sec:30 Twp: Footage: 660 FNL  1980 FEL
Proposed Depth/Form:7800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/14/2003
Spud Date:8/22/2003Spud Date Is:ACTUAL
Measured TD:7560 ft.Measured PB depth:7558 ft.
True Vertical TD:7527 ft.True Vertical PB depth:0 ft.
Top PZ Location:Sec: Twp: Footage: 674 FNL  2007 FEL
Bottom Hole Location:Sec:30 Twp: Footage: 660 FNL  1980 FEL
Log Types:PEX, CV/CL/GR, BCS/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 830 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 830 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7555 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1095, Top: 450 ft., Bottom: 7560 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.4153 ft.NN
WILLIAMS FORK4154 ft.7263 ft.NN
ROLLINS7264 ft.7560 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/12/2012                 Interval Top: 5430 ft.    Interval Bottom: 6738 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/14/2003
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:2.375 in.Tubing Setting Depth:6324 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_BBLS_OIL 1
CALC_GOR 842
CALC_MCF_GAS 842
CASING_PRESS 250
MCF_GAS 842
Perforation Data:
Interval Top:5430 ft.# Of Holes:70
Interval Bottom:6738 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)38
Total Gas Produced (MCF)7143
GOR187973
GOR DeterminationMCFE
Average BOE per Day3.473
Average MCFE per Day20.169

 Federal Financial Assurance  i 

 Tribal Well  i No