|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/1/2023 Measured TD: 6650 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/1/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 20030993 | Expiration Date: | 6/24/2004 | | Proposed Depth/Form: | 7200 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 14 in., Top: , Depth: 40 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 31, Top: 0 ft., Bottom: 40 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/27/2003 | | Spud Date: | 7/9/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 6650 ft. | Measured PB depth: | 6538 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SPECTRAL DENSITY DUAL SPACED NEUTRON, INDUCTION LOG, THERMAL MULTIGATE DECAY LITHOLOGY LOG, CEMENT BOND LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 740 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 740 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6641 ft., Weight: 12.6 , Citings Type: ACTUAL | | Cement: | Sacks: 2000, Top: 0 ft., Bottom: 6641 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 0 ft. | 2159 ft. | N | N | | OHIO CREEK | 2159 ft. | 2541 ft. | N | N | | WILLIAMS FORK | 2541 ft. | 6112 ft. | N | N | | CAMEO COAL | 6112 ft. | 6369 ft. | N | N | | ROLLINS | 6371 ft. | | Y | N |
Formation RLNS Formation Classification: OG Status: SI - 11/1/2025 Interval Top: 6410 ft. Interval Bottom: 6455 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 11/2/2005 | Choke Size: | | | Formation Name: | ROLLINS | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/1/2003 | | Treatment Summary: | RLNS: FRAC'D W/114,060 GALS SLICKWATER & 58,000# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 0 | | BTU_GAS | 1152 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 695 | | CASING_PRESS | 643 | | MCF_GAS | 695 |
| | Perforation Data: | | Interval Top: | 6410 ft. | # Of Holes: | 90 | | Interval Bottom: | 6455 ft. | Hole Size: | 0.32 in. |
|
Formation WFCM Formation Classification: OG Status: PR - 11/1/2023 Interval Top: 4612 ft. Interval Bottom: 5420 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 11/2/2005 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/14/2010 | | Treatment Summary: | A portion of the WFCM is T&A'd from 5420'-6016' by CIBP | | Formation Treatment | | Treatment Date: | 9/1/2003 | | Treatment Summary: | WFCM: STG 1: 44,225 GALS GEL, 167,150# 20/40 OTTAWA SAND & 4640# 100 MESH. STG 2: 83,379 GALS SLICKWATER & 50,073 # 20/40 OTTAWA SAND. STG 3: 121,026 GALS SLICKWATER & 86,453# 20/40 OTTAWA SAND. STG 4: 168,678 GALS SLICKWATER & 121,542# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 180 | | BBLS_OIL | 34 | | BTU_GAS | 1152 | | CALC_BBLS_H2O | 180 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 26794 | | CALC_MCF_GAS | 911 | | CASING_PRESS | 1150 | | MCF_GAS | 911 | | TUBING_PRESS | 605 |
| | Perforation Data: | | Interval Top: | 4612 ft. | # Of Holes: | 180 | | Interval Bottom: | 5420 ft. | Hole Size: | 0.32 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 3/19/2008 Interval Top: 4612 ft. Interval Bottom: 6016 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.281 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/27/2003 | | Treatment Summary: | SEE OGCC COMMENTS |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6460 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/28/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 180 | | BBLS_OIL | 34 | | CALC_BBLS_H2O | 180 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 36794 | | CALC_MCF_GAS | 911 | | CASING_PRESS | 1150 | | MCF_GAS | 911 | | TUBING_PRESS | 605 |
| | Perforation Data: | | Interval Top: | 4612 ft. | # Of Holes: | 180 | | Interval Bottom: | 6016 ft. | Hole Size: | |
|
Formation WMRCM Formation Classification: GW Status: CM - 10/13/2011 Interval Top: 4612 ft. Interval Bottom: 6455 ft.| Completed Information for Formation WILLIAMS FK-ROLLINS-CAMEO | | 1st Production Date: | 11/2/2005 | Choke Size: | | | Formation Name: | WILLIAMS FK-ROLLINS-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/1/2003 | | Treatment Summary: | SEE INDIVIDUAL FORMATION BREAKDOWN |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMRCM. |
| | Perforation Data: | | Interval Top: | 4612 ft. | # Of Holes: | 270 | | Interval Bottom: | 6455 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 10 |
| Total Gas Produced (MCF) | 2856 |
| GOR | 285600 |
| GOR Determination | MCFE |
| Average BOE per Day | 1.380 |
| Average MCFE per Day | 7.984 |
| Federal Financial Assurance | i | Y |
|
|