Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09196
Well Classification: GW Status: SI - 11/1/2025
Well Name/No:GRAHAM #18-14B (13WB)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:267449LocationID:334658
County:GARFIELD #045Location:SESE 13 7S93W 6
Field:MAMM CREEK - #52500Elevation:6284 ft.
Basin:PICEANCE BASIN  
Planned Location:1159FSL  1180 FELLat/Long: 39.441921 / -107.718634Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.441920 / -107.718510Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 11/1/2025             Measured TD: 7505 ft.    Vertical TD: 7305 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 11/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20030635 Expiration Date:4/20/2004
Proposed Top PZ Location:Sec:18 Twp: Footage: 1315 FSL  83 FWL
Bottom Hole Location:Sec:18 Twp: 7S 92W Footage: 1230 FSL  400 FWL
Proposed Depth/Form:7900 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:HUNTER MESA UNI Unit Number:COC 55972X
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/2/2004
Spud Date:10/18/2003Spud Date Is:ACTUAL
Measured TD:7505 ft.Measured PB depth:7461 ft.
True Vertical TD:7305 ft.True Vertical PB depth:
Top PZ Location:Sec:18 Twp: Footage: 1315 FSL  83 FWL
Bottom Hole Location:Sec:18 Twp: 7S 92WFootage: 1230 FSL  400 FWL
Log Types:CBL, PEX
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 856 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 856 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7505 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1355, Top: 430 ft., Bottom: 7505 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.4375 ft.NN
WILLIAMS FORK4376 ft.7358 ft.NN
ROLLINS7359 ft.7505 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 5340 ft.    Interval Bottom: 7283 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/2/2004
Treatment Summary:SEE SCANNED DOC# 1160975
Tubing Size:2.375 in.Tubing Setting Depth:6629 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/18/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_OIL 1
CALC_GOR 842
CALC_MCF_GAS 842
CASING_PRESS 250
MCF_GAS 842
Perforation Data:
Interval Top:5340 ft.# Of Holes:110
Interval Bottom:7283 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)5
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.013

 Federal Financial Assurance  i Y

 Tribal Well  i No