Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09192
Well Classification: GW Status: PR - 8/1/2022
Well Name/No:MILLER #5-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2022
FacilityID:267006LocationID:334962
County:GARFIELD #045Location:SWNW 36 6S92W 6
Field:MAMM CREEK - #52500Elevation:5896 ft.
Basin:PICEANCE BASIN  
Planned Location:1933FNL  649 FWLLat/Long: 39.485821 / -107.622252Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.485815 / -107.622242Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2022             Measured TD: 6907 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2022
Wellbore Permit
Permit #:Expiration Date:4/6/2004
Proposed Depth/Form:6800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RL-WF , Formation: ROLLINS-WILLIAMS FORK , Order: 191-5 , Unit Acreage: 40, Drill Unit: SEC.36

Wellbore Completed
Completion Date:5/4/2003
Spud Date:4/17/2003Spud Date Is:ACTUAL
Measured TD:6907 ft.Measured PB depth:6862 ft.
True Vertical TD:True Vertical PB depth:
Log Types:INDUCTION, DENSITY & SONIC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 681 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: , Bottom: 681 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6907 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1740, Top: , Bottom: 4480 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH3031 ft.NN
OHIO CREEK3031 ft.3524 ft.NN
UNKNOWN3524 ft.6429 ft.NN
CAMEO6429 ft.6663 ft.NN
ROLLINS6663 ft.6907 ft.NN

Formation RLNS                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 6644 ft.    Interval Bottom: 6764 ft.

 Completed Information for Formation ROLLINS
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:ROLLINSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2003
Treatment Summary:6644'-6660' ACIDIZED W/100 GAL 7-1/2% HCL / 6756'-6764' FRAC'D W/59,505 # SAND PLUS 789 BW
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/16/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 0
CASING_PRESS 200
MCF_GAS 120
TUBING_PRESS 30
Perforation Data:
Interval Top:6644 ft.# Of Holes:64
Interval Bottom:6764 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 8/1/2022                  Interval Top: 4594 ft.    Interval Bottom: 6209 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.281 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2003
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6012 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/25/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 9
BTU_GAS 1185
CALC_BBLS_H2O 30
CALC_BBLS_OIL 10
CALC_GOR 44000
CALC_MCF_GAS 440
CASING_PRESS 760
GRAVITY_OIL 40
MCF_GAS 440
TUBING_PRESS 440
Perforation Data:
Interval Top:4594 ft.# Of Holes:57
Interval Bottom:6209 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)8
Total Gas Produced (MCF)1346
GOR168250
GOR DeterminationMCFE
Average BOE per Day0.655
Average MCFE per Day3.821

 Federal Financial Assurance  i 

 Tribal Well  i No