Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09147
Well Classification: GW Status: PR - 9/24/2003
Well Name/No:FEDERAL #PA 12-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date9/24/2003
FacilityID:266417LocationID:335129
County:GARFIELD #045Location:SWNW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5680 ft.
Basin:PICEANCE BASIN  
Planned Location:2297FNL  998 FWLLat/Long: 39.496159 / -108.008873Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.496193 / -108.008832Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/24/2003             Measured TD: 7735 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/24/2003
Wellbore PermitDIRECTIONAL
Permit #:20030258 Expiration Date:2/27/2004
Proposed Top PZ Location:Sec: Twp: Footage: 2300 FNL  750 FWL
Bottom Hole Location:Sec: Twp: Footage: 2300 FNL  750 FWL
Proposed Depth/Form:7810 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-35 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/13/2003
Spud Date:6/22/2003Spud Date Is:ACTUAL
Measured TD:7735 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2300 FNL  750 FWL
Bottom Hole Location:Sec: Twp: Footage: 2300 FNL  750 FWL
Log Types:HIGH RESOLUTION IND.,SPECTRAL DEN. DUAL SPACED NEU.CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2312 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 0 ft., Bottom: 2312 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7729 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 855, Top: 4500 ft., Bottom: 7728 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G2115 ft.NN
FORT UNION2458 ft.NN
MESAVERDE4289 ft.NN
CAMEO COAL6956 ft.NN
ROLLINS7664 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/24/2003                 Interval Top: 5686 ft.    Interval Bottom: 7563 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/13/2003
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6971 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/24/2003Test Method:
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1078
CALC_MCF_GAS 1120
Perforation Data:
Interval Top:5686 ft.# Of Holes:87
Interval Bottom:7563 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)10152
GOR534315
GOR DeterminationMCFE
Average BOE per Day4.850
Average MCFE per Day28.129

 Federal Financial Assurance  i Y

 Tribal Well  i No