Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09139
Well Classification: OW Status: PR - 7/3/2003
Well Name/No:PA #24-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date7/3/2003
FacilityID:266290LocationID:335406
County:GARFIELD #045Location:SESW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5596 ft.
Basin:PICEANCE BASIN  
Planned Location:398FSL  1726 FWLLat/Long: 39.489359 / -108.006493Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.489364 / -108.006488Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/3/2003             Measured TD: 7570 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/3/2003
Wellbore PermitDIRECTIONAL
Permit #:20030123 Expiration Date:2/20/2004
Proposed Top PZ Location:Sec: Twp: Footage: 505 FSL  1726 FWL
Bottom Hole Location:Sec: Twp: Footage: 1050 FSL  1600 FWL
Proposed Depth/Form:7580 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-34 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/8/2003
Spud Date:4/30/2003Spud Date Is:ACTUAL
Measured TD:7570 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 505 FSL  1726 FWL
Bottom Hole Location:Sec: Twp: Footage: 1050 FSL  1600 FWL
Log Types:CASED HOLE DUAL SPACED NEUTRON, C B L
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2151 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 765, Top: , Bottom: 2151 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7568 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 3700 ft., Bottom: 7567 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1940 ft.NN
FORT UNION2305 ft.NN
MESAVERDE4194 ft.NN
CAMEO6818 ft.NN
ROLLINS7524 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 7/3/2003                  Interval Top: 5910 ft.    Interval Bottom: 7446 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2003
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7132 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/3/2003Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1387
CASING_PRESS 1924
TUBING_PRESS 1727
Perforation Data:
Interval Top:5910 ft.# Of Holes:75
Interval Bottom:7446 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)13779
GOR810529
GOR DeterminationMCFE
Average BOE per Day6.557
Average MCFE per Day38.036

 Federal Financial Assurance  i 

 Tribal Well  i No