Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09123
Well Classification: GW Status: SI - 10/1/2025
Well Name/No:ASPEN RM #10-6C (F10E)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2025
FacilityID:266192LocationID:324224
County:GARFIELD #045Location:SENW 10 7S92W 6
Field:MAMM CREEK - #52500Elevation:6042 ft.
Basin:PICEANCE BASIN  
Planned Location:2431FNL  1550 FWLLat/Long: 39.461959 / -107.656285Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.462000 / -107.656310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2025             Measured TD: 6000 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2025
Wellbore Permit
Permit #:20030235 Expiration Date:2/12/2004
Proposed Depth/Form:5500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:HUNTER MESA UNI Unit Number:COC 55972X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/27/2003
Spud Date:2/22/2003Spud Date Is:ACTUAL
Measured TD:6000 ft.Measured PB depth:5967 ft.
True Vertical TD:0 ft.True Vertical PB depth:0 ft.
Log Types:CBL/VD/GR/CCL, CB/GR/TEMP, AI/LC/GR, CN/TLD/GR, BCS/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1012 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 395, Top: 0 ft., Bottom: 1012 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6000 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1400, Top: 0 ft., Bottom: 6000 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.2735 ft.NN
WILLIAMS FORK2736 ft.5887 ft.NN
ROLLINS5888 ft.6000 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 10/1/2025                 Interval Top: 3771 ft.    Interval Bottom: 5880 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/27/2003
Treatment Summary:STAGE 1:ACID BALLOUT,5796-5880,64-0.320" SHOTS, NO FRAC, STAGE 2: ACID BALLOUT, 4236-4493,16-0.3320" SHOTS, 2633 BBLS OF SLICKWATER,132720# 20-40 SAND, STAGE 3: ACID BALLOUT,3771-4007,14-0.320" SHOTS, 2530 BBLS OF SLICKWATER, 143600# 20-40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:4229 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/27/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 202
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 202
CALC_BBLS_OIL 1
CALC_GOR 1175
CALC_MCF_GAS 1175
CASING_PRESS 695
MCF_GAS 1175
TUBING_PRESS 416
Perforation Data:
Interval Top:3771 ft.# Of Holes:94
Interval Bottom:5880 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)39
GOR
GOR DeterminationMCFE
Average BOE per Day0.019
Average MCFE per Day0.108

 Federal Financial Assurance  i Y

 Tribal Well  i No