Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09097
Well Classification: GW Status: SI - 8/1/2025
Well Name/No:SHAEFFER #12-9D (P12W)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2025
FacilityID:265947LocationID:334823
County:GARFIELD #045Location:SESE 12 7S93W 6
Field:MAMM CREEK - #52500Elevation:6240 ft.
Basin:PICEANCE BASIN  
Planned Location:789FSL  780 FELLat/Long: 39.455391 / -107.717224Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.455630 / -107.717070Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 8/1/2025             Measured TD: 7655 ft.    Vertical TD: 7561 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 8/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20030112 Expiration Date:1/28/2004
Proposed Top PZ Location:Sec:12 Twp: Footage: 1391 FSL  217 FEL
Bottom Hole Location:Sec:12 Twp: Footage: 1400 FSL  200 FEL
Proposed Depth/Form:7900 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:HUNTER MESA UNI Unit Number:COC 55972X
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/16/2003
Spud Date:8/17/2003Spud Date Is:ACTUAL
Measured TD:7655 ft.Measured PB depth:7592 ft.
True Vertical TD:7561 ft.True Vertical PB depth:0 ft.
Top PZ Location:Sec:12 Twp: Footage: 1391 FSL  217 FEL
Bottom Hole Location:Sec:12 Twp: Footage: 1400 FSL  200 FEL
Log Types:SCBL, RSL
Casing:String Type: SURF, Hole Size: 2.25 in., Size: 8.625 in., Top: 0 ft., Depth: 845 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 845 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7655 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1290, Top: 2000 ft., Bottom: 7655 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.4331 ft.NN
WILLIAMS FORK4332 ft.7279 ft.NN
ROLLINS7280 ft.7655 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 8/1/2025                  Interval Top: 5178 ft.    Interval Bottom: 7133 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/16/2003
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:2.375 in.Tubing Setting Depth:6491 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_BBLS_OIL 1
CALC_GOR 2358
CALC_MCF_GAS 2358
CASING_PRESS 700
MCF_GAS 2358
Perforation Data:
Interval Top:5178 ft.# Of Holes:110
Interval Bottom:7133 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.022

 Federal Financial Assurance  i Y

 Tribal Well  i No