Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09069
Well Classification: GW Status: PR - 1/1/2026
Well Name/No:BENZEL #26-15A (P26NWB)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:265840LocationID:335365
County:GARFIELD #045Location:SESE 26 6S93W 6
Field:MAMM CREEK - #52500Elevation:5785 ft.
Basin:PICEANCE BASIN  
Planned Location:287FSL  1043 FELLat/Long: 39.491010 / -107.737015Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.491130 / -107.737150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2026             Measured TD: 8162 ft.    Vertical TD: 7980 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2026
Wellbore PermitDIRECTIONAL
Permit #:20030016 Expiration Date:1/16/2004
Proposed Top PZ Location:Sec: Twp: Footage: 1319 FSL  1317 FEL
Bottom Hole Location:Sec:26 Twp: Footage: 1320 FSL  1320 FEL
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/21/2003
Spud Date:3/27/2003Spud Date Is:ACTUAL
Measured TD:8162 ft.Measured PB depth:8093 ft.
True Vertical TD:7980 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1319 FSL  1317 FEL
Bottom Hole Location:Sec:26 Twp: Footage: 1320 FSL  1320 FEL
Log Types:C B L, R S L
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 795 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 795 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8160 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1185, Top: 3100 ft., Bottom: 8160 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.4900 ft.NN
WILLIAMS FORK4901 ft.7867 ft.NN
ROLLINS7868 ft.8162 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 5788 ft.    Interval Bottom: 7776 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/21/2003
Treatment Summary:SEE SCANNED DOC# 1159559
Tubing Size:2.375 in.Tubing Setting Depth:7130 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/21/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 129
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 129
CALC_BBLS_OIL 1
CALC_GOR 2026
CALC_MCF_GAS 2026
CASING_PRESS 2200
MCF_GAS 2025
TUBING_PRESS 1650
Perforation Data:
Interval Top:5788 ft.# Of Holes:120
Interval Bottom:7776 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)5066
GOR266631
GOR DeterminationMCFE
Average BOE per Day2.452
Average MCFE per Day14.228

 Federal Financial Assurance  i Y

 Tribal Well  i No