Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09061
Well Classification: GW Status: PR - 7/26/2003
Well Name/No:ROSE RANCH #10-10C (I10B)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/26/2003
FacilityID:265803LocationID:334675
County:GARFIELD #045Location:NWSE 10 7S93W 6
Field:MAMM CREEK - #52500Elevation:6867 ft.
Basin:PICEANCE BASIN  
Planned Location:1370FSL  1567 FELLat/Long: 39.456431 / -107.756825Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.456610 / -107.756930Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/26/2003             Measured TD: 8664 ft.    Vertical TD: 8487 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/26/2003
Wellbore PermitDIRECTIONAL
Permit #:20022390 Expiration Date:1/13/2004
Proposed Top PZ Location:Sec: Twp: Footage: 1340 FSL  2589 FEL
Bottom Hole Location:Sec: Twp: Footage: 1330 FSL  2500 FEL
Proposed Depth/Form:8800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:HUNTER MESA FED Unit Number:COC 55279X
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/12/2003
Spud Date:5/8/2003Spud Date Is:ACTUAL
Measured TD:8664 ft.Measured PB depth:
True Vertical TD:8487 ft.True Vertical PB depth:8607 ft.
Top PZ Location:Sec: Twp: Footage: 1340 FSL  2589 FEL
Bottom Hole Location:Sec: Twp: Footage: 1330 FSL  2500 FEL
Log Types:CBL / VD / GR / CCL, RSL / SM / GR / CCL
Casing:String Type: SURF, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8661 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1215, Top: 1400 ft., Bottom: , Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 916 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 475, Top: , Bottom: 916 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.6058 ft.NN
WILLIAMS FORK6059 ft.8664 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/26/2003                 Interval Top: 7182 ft.    Interval Bottom: 8256 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/12/2003
Treatment Summary:SEE SCANNED DOC# 1157993
Tubing Size:2.375 in.Tubing Setting Depth:7892 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/26/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 1
CALC_BBLS_H2O 1
CALC_BBLS_OIL 1
CALC_GOR 2174
CALC_MCF_GAS 2174
CASING_PRESS 1370
MCF_GAS 2173
TUBING_PRESS 540
Perforation Data:
Interval Top:7182 ft.# Of Holes:64
Interval Bottom:8256 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)68
Total Gas Produced (MCF)12225
GOR179779
GOR DeterminationMCFE
Average BOE per Day5.965
Average MCFE per Day34.579

 Federal Financial Assurance  i Y

 Tribal Well  i No