Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09033
Well Classification: GW Status: PR - 4/2/2003
Well Name/No:LINDAUER #GM 341-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/2/2003
FacilityID:265597LocationID:334949
County:GARFIELD #045Location:NENE 11 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5346 ft.
Basin:PICEANCE BASIN  
Planned Location:1186FNL  1103 FELLat/Long: 39.456179 / -108.071905Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.456421 / -108.072093Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/2/2003             Measured TD: 6437 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/2/2003
Wellbore PermitDIRECTIONAL
Permit #:20022238 Expiration Date:12/19/2003
Proposed Top PZ Location:Sec: Twp: Footage: 572 FNL  511 FEL
Bottom Hole Location:Sec: Twp: Footage: 510 FNL  480 FEL
Proposed Depth/Form:6400 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479.10 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:3/8/2003
Spud Date:2/5/2003Spud Date Is:ACTUAL
Measured TD:6437 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 572 FNL  511 FEL
Bottom Hole Location:Sec: Twp: Footage: 510 FNL  480 FEL
Log Types:THERMAL MULTIGATE DECAY LOG,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1125 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 1125 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6427 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 3200 ft., Bottom: 6426 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH GNN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/2/2003                  Interval Top: 4678 ft.    Interval Bottom: 6264 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/2003
Treatment Summary:5141-55432':17 HOLES W/750 GALS 7 1/2% HCL, 130758# 20/40, 3020 BBLS SLICK WATER. ;4678-4914' 20 HOLES W/750 GA;S 7 1/2% HCL, 174443# 20/40. 3904 BB;S S;OCL WATER/
Tubing Size:2.375 in.Tubing Setting Depth:5592 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/2/2003Test Method:
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_MCF_GAS 1554
CASING_PRESS 1666
TUBING_PRESS 1570
Perforation Data:
Interval Top:4678 ft.# Of Holes:
Interval Bottom:6264 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9579
GOR798250
GOR DeterminationMCFE
Average BOE per Day4.559
Average MCFE per Day26.424

 Federal Financial Assurance  i 

 Tribal Well  i No