|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/12/2003 Measured TD: 6187 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/12/2003 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20021909 | Expiration Date: | 10/20/2003 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 758 FSL 1816 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 815 FSL 1880 FWL | | Proposed Depth/Form: | 6101 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 479-10 , Unit Acreage: 320, Drill Unit: W/2 |
| | |
| Wellbore Completed | | Completion Date: | 1/25/2002 | | Spud Date: | 12/15/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 6187 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 758 FSL 1816 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 815 FSL 1880 FWL | | Log Types: | CASED HOLE NEUTRON DENSITY LOG; GAMMA RAY | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1078 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: , Bottom: 1078 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6177 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 3400 ft., Bottom: 6176 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1221 ft. | | N | N | | FORT UNION | 1521 ft. | | N | N | | MESAVERDE | 3052 ft. | | N | N | | CAMEO COAL | 5587 ft. | | N | N | | ROLLINS | 6026 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 2/12/2003 Interval Top: 4357 ft. Interval Bottom: 5950 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.188 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/25/2002 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5374 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/12/2003 | Test Method: | | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 1528 | | CASING_PRESS | 1625 | | TUBING_PRESS | 1535 |
| | Perforation Data: | | Interval Top: | 4357 ft. | # Of Holes: | 71 | | Interval Bottom: | 5950 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 13 |
| Total Gas Produced (MCF) | 10347 |
| GOR | 795923 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.926 |
| Average MCFE per Day | 28.562 |
| Federal Financial Assurance | i | |
|
|