|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/1/2017 Measured TD: 6059 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/1/2017 | | Wellbore Permit | | | Permit #: | 20021743 | Expiration Date: | 9/12/2003 | | Proposed Depth/Form: | 6169 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 479-10 , Unit Acreage: 320, Drill Unit: W/2 |
| | |
| Wellbore Completed | | Completion Date: | 2/19/2003 | | Spud Date: | 12/30/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 6059 ft. | Measured PB depth: | 6039 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 1578 FSL 784 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 1453 FSL 808 FWL | | Log Types: | DUAL IND. SPECTRAL DEN. DUAL SPACED NEU.,CBL | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 633 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 633 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6049 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 2680 ft., Bottom: 6048 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1274 ft. | | N | N | | FORT UNION | 1615 ft. | | N | N | | MESAVERDE | 3043 ft. | | N | N | | CAMEO COAL | 5558 ft. | | N | N | | ROLLINS | 6002 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 12/1/2017 Interval Top: 4352 ft. Interval Bottom: 5905 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.203 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/19/2003 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5250 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/11/2003 | Test Method: | | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 1296 | | CASING_PRESS | 1497 | | TUBING_PRESS | 1390 |
| | Perforation Data: | | Interval Top: | 4352 ft. | # Of Holes: | 67 | | Interval Bottom: | 5905 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 509 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.241 |
| Average MCFE per Day | 1.395 |
| Federal Financial Assurance | i | |
|
|